NEVER LEAVE HEATER UNATTENDED WHILE BURNING
OR WHILE CONNECTED TO A POWER SOURCE
© 2017, Pinnacle Climate Technologies, Inc.
Kerosene Forced Air Heater User’s Manual
11
Maintenance (Continued)
3. Allow the heater to attempt ignition for 3-5 seconds, during
which time you may hear a loud “grinding” or vibration sound.
4. If your heater has not ignited, re-start the ignition sequence.
Once the heater has ignited, turn the Air Vent Screw clockwise
until fully hand-tightened. See Figure 15. Any air trapped in the
fuel pump will have been purged.
5. Your heater is now ready for operation.
6. Re-fill your heater with fuel before it runs out. This will prevent
the fuel lines and fuel pump from drawing in air and having to
go through the air bleeding procedure again.
Figure 15.
Tightening Air Vent Screw
Wiring Diagram
A
IR BLEED DIRECTIONS (Continued)