FINISHING
(1) Heat insulate the connections between pipes.
•
For rear, right, and bottom piping, butt the connection piping insu-
lation material against the indoor unit piping and fasten it with seal
A (UNIT B only) and vinyl tape so there is no gap.
•
For left and left bottom piping wrap the piping with cloth tape within
the range that encompasses the piping housing section at the rear
of the indoor unit.
(2) Push the bottom of the indoor unit against the wall and hook the
two pawls at the bottom of the indoor unit to the mounting plate
hooks. At this time, check the following:
•
Are the top and bottom hooks seated positively? Check by moving
the indoor unit forward, backward, left and right.
•
Is the indoor unit installed level and perpendicular?
•
For left rear piping, is the drain hose at the bottom of the wall hole
pipe?
(3) Temporarily fasten the connection cable along the connection pip-
ing with vinyl tape and wrap decorative tape around the part that is
visible from the body. For right, bottom, and left piping, securely
wrap the part coming from the body with decorative tape so that
the piping does not swell. (Overlap wrapping of outdoor parts about
1/3 of the width of the tape from the bottom of the piping so that
water will not enter.)
(4) Fasten the connection pipe to the outside wall with a saddle, etc.
(5) Fill the gap between the outside wall pipe hole and the pipe with
sealer so that rain water and wind cannot blow in.
(6) Fasten the drain hose to the outside wall, etc.
UNIT B
Installing the under covers
(1) Installing under cover A (Fig. 42)
1
Hook the two pipe bracket hooks to the two holes in the back
of under cover A.
2
While pulling the left side of under cover A forward about 1
cm (at this time, hold hook
1
so that it does not come
unhooked), slide under cover A to the right and hook the hook.
3
Push the left side of under cover A in the arrow direction and
attach the two side hooks to the base.
4
Install under cover A to the pipe bracket with the tapping screw.
Fig. 42
(2) Installing under cover B (Fig. 43)
5
Push the left side of under cover B in the arrow direction and
attach the two hooks to under cover A.
6
Push the right side of under cover B in the arrow direction and
attach the two side hooks to the base.
Fig. 43
Pipe bracket
Base
Side
hook
Under cover A
Hook
Hole
Stopper
Tapping
screw
3
1
2
4
Under cover A
Under cover B
Side hook
Base
Fig. 44
Indoor unit pipe (heat insulation)
Connection pipe (heat insulation)
Vinyl tape
Fig. 45
Fig. 47
Fig. 46
Fig. 48
Fig. 49
Butt connection pipe (heat insulation) against the
indoor unit pipe (heat insulation) and wrap with
seal A so that there is no gap.
Seal A
Wrap with cloth tape
Drain hose
Cloth tape
Pipe
Left piping
Connection cord
Pipe
Drain hose
For connection from the left rear
Connection pipe
Wall pipe
Connection cord
Drain hose
(View from indoors)
GOOD
Drain hose
BAD
BAD
BAD
Saddle
Lifted up
Wave
End in water
(Outside wall cap)
(Sealer putty)
(Outdoors)
Wall
(Saddle)
Pipe
6
5
Check the following: