ASSEMBLY INSTRUCTIONS
STEP 9
STEP 10
14
14
13
15
CC
12
12
EE
Hang right side shelf assembly (12) on four pre-installed M5 x 16 bolts, tighten it. Lock front panel
of right side shelf assembly (12) to main control panel with two M5 x 12 bolts (EE).
Put the control knob bezel (13) on front panel of right side shelf assembly (12), connect side burner
valve assembly (15) and control knob bezel (13) with two M4 x 10 bolts (CC).
EE
Hardware Used
2pcs
M5 x 12 bolt
cc
Hardware Used
2pcs
M4 x 10 bolt