Marvel 6SWCE-BB-G Скачать руководство пользователя страница 2

A 3 1/2 INCH TOE KICK OR 8 SCREWS FOR A 4 INCH TOE KICK.

THE WOOD FRAME. A TOTAL OF 10 SCREWS WILL BE NEEDED FOR

2. USE ONLY PAN HEAD SCREWS

3. DO NOT SELECT A SCREW THAT IS LONGER THAN THE WOOD

4. USE RECOMMENDED PILOT HOLES FOR THE FRAME MATERIAL (SEE

1. A #8 PAN HEAD WOOD SCREW SHOULD BE USED TO PROPERLY SECURE

THICKNESS AT THE SCREW LOCATIONS.

CHART BELOW)

DOOR FRONT

SURFACE

DOOR HINGE

SCREW HOLES

THIS SURFACE PARALLEL TO THE UNIT.

(RIGHT HAND SWING DOOR SHOWN)

1. ATTACH THE TOP AND BOTTOM DOOR HINGES TO THE DOOR WITH THE

10-32 MACHINE SCREWS AND A 1/8 INCH ALLEN HEAD DRIVER AS SHOWN IN

THE FIGURE BELOW.

2. PRESS IN THE SHOULDER BUSHINGS TO THE TOP AND BOTTOM DOOR

HINGES. MAKE CERTAIN THAT THE SHOULDER IS TO THE OUTSIDE OF THE

DOOR AS SHOWN IN THE FIGURE BELOW.

3. TEST FIT THE DOOR TO THE UNIT TO MAKE CERTAIN DOOR WILL HANG

CORRECTLY. THE DOOR IS HUNG CORRECTLY WHEN THE TOP OF THE DOOR

IS PARALLEL TO THE TOP OF THE UNIT. ADJUSTMENTS CAN BE MADE BY

LOOSING THE DOOR HINGE MACHINE SCREWS AND MOVING THE DOOR HINGE

ON THE DOOR.

4. TIGHTEN ALL FOUR MACHINE SCREWS AFTER ADJUSTMENTS HAVE BEEN

MADE.

5. REMOVE THE DOOR FROM THE UNIT BY REMOVING THE UNITS TOP HINGE

SET SCREW AND ANGLING THE DOOR OFF OF THE BOTTOM HINGE PIN.

TYPICAL

TOP AND

BOTTOM

DOOR HINGE

ASSEMBLY

SHOULDER BUSHING

DOOR HINGE

10-32 MACHINE

SCREWS

Отзывы: