© Martin Engineering GmbH
11
M3776UK-05/10
Installing controller
4
Installing controller
IMPORTANT
Read through these Operating Instructions in full before starting the
installation. Otherwise you will miss important information for
appropriate installation.
The installation of the Air Cannon Controller is carried out in several steps:
1. Assembly of the controller.
2. Connection of the controller.
3. Programming controller.
4. Trial run of the controller.
4.1
Assembly of the controller
The controller is completely assembled on delivery and is securely moun-
ted to the MARTIN
®
MultiPort air cannon.
NOTE
Mounting at a different location than directly to the MARTIN
®
MultiPort air cannon is not envisaged. If you want to install the control
system at a different location, please observe the mass stated in fig. 3
and all valid standards and regulations with regard to the installation
and use of electrical equipment.
Figure 3: Dimensions of the controller
∅9
380
340
600
550
H3
H1
H5
H2
S1
Auswahlschalter Slaves
Slave Switch Q2
Hauptschalter
Main Switch Q1
Air Tank Full
Yellow
FAULT
Red
RUN
White
AUTOMATIC
Green
AUTO
MAN.
II
0
I
0
OFF
I ON
210
248