Mars Wind Stopping 16-CSI-Spec
Revised 10/15/2020
MARS AIR SYSTEMS, LLC
23 24 33.14 – 9
H.
Provide connection to piped services and utilities as specified in Section 22 10 00 and 23
21 00.
3.3
FIELD QUALITY CONTROL
A.
Adjust air curtains to function properly.
B.
Adjust air foil vanes located within the discharge nozzle as required for prevailing
conditions at each opening.
C.
Check heated air curtain performance on a calm day by measuring air temperature 6
inches off the floor. Optimal reading is halfway between the temperature inside and
outside the building.
3.4
CLEANING
A.
Clean air curtains promptly after installation in accordance with manufacturer's
instructions.
B.
Repair minor damages to finish in accordance with manufacturer's instructions and as
approved by Architect.
C.
Remove and replace damaged components that cannot be successfully repaired as
determined by Architect.
3.5
PROTECTION
A.
Protect materials and finish from damage until substantial completion.
3.6
SCHEDULES
A.
Refer to Air Curtain Schedule appended to this section.
END OF SECTION