
Mars Low Profile Series 2-CSI-Spec
Revised 2/3/2021
MARS AIR SYSTEMS, LLC
23 34 33 – 9
6.
Summer-Winter modes
7.
24/7 timer
8.
Maintenance schedule alerts
9.
Status display showing date, time, temperature and air curtain mode
10.
Multi-unit control capability
11.
English (IP) or Metric (SI) display readings
12.
Password protected
13.
Auto Lock display
14.
Emergency shut-off button
15.
High temperature lock from fan failure
16.
Low voltage control signal for door activation
17.
Integrated BMS controls
18.
VFD compatible with 0-10VDC output
19.
Optional BACnet option
20.
Optional adaptive fan speed control and heat control based on existing field
conditions. Field mounted outdoor temperature sensors required.
F.
Provide mounting hardware as required for the opening.
PART 3
EXECUTION
3.1
EXAMINATION
A.
Verify that required utilities are in correct location and are of correct capacities for
specified products.
B.
Verify openings to receive air curtains are plumb, level, square, accurately aligned,
correctly located, and in tolerance.
C.
Examine surfaces to receive air curtains. If surface preparation is the responsibility of
another installer, notify Architect of unsatisfactory preparation before proceeding.
3.2
INSTALLATION
A.
Install air curtains in accordance with approved shop drawings and manufacturer's printed
installation instructions.
B.
Install air curtains plumb, level, square, true to line, and weathertight, without warp or
rack.
C.
Anchor air curtains securely in place to supports.
D.
Coordinate with sheet metal flashing as specified in Section 07 62 00.
E.
Install joint sealants as specified in Section 07 92 00.
F.
Coordinate with electrical power as specified in Section 26 05 00.