
RECEIVING AND INSPECTION
Upon receiving the product, check to make sure all items
including switches are accounted for by referencing the
Bill of Lading to ensure all items were received. Inspect
each carton for shipping damage before accepting
delivery. Notify the freight carrier if any damage is
noticed. The carrier will make notification on the delivery
receipt acknowledging any damage to the product. All
damage should be noted on all copies of the Bill of Lading
which is countersigned by the delivering carrier. A Carrier
Inspection Report should be filled out by the carrier upon
arrival and a report given to the Traffic Department. If
damaged upon arrival, file a claim immediately with the
carrier. Any physical damage to the unit after acceptance
is not the responsibility of Mars Air Systems.
UNPACKING
Verify that all parts, components and accessories, and
the correct quantities of each have been received. If any
items are missing, report shortages to Mars Air Systems
directly to arrange for obtaining the missing items. Again,
verify quantities received against those on the Bill of
Lading only, as multiple shipments may be involved.
INSTALLATION
Typical Mounting – Wall or Ceiling Mounted
Horizontally Above the Door Opening
1. Remove the air intake grille(s) and/or air intake filter(s)
from the product and set aside. Gently remove all
packaging materials, hardware,
and all other
accessories from interior of unit prior to operating.
Severe unit damage will occur if these items are not
removed prior to operation.
2. Lay unit on its top with directional vanes pointing up and
remove the Tek Screws from the wall mounting plate,
just behind the discharge nozzle, and remove the
mounting plate from the unit. (FIG. 1) Measure the
mounting plate and center it over the opening. The air
curtain shall be equal to or greater than the width of the
opening.
3. Install the mounting plate(s) above the opening. Multiple
pre-punched 7/16” mounting holes are provided for your
convenience. These holes must be utilized to secure
the product to the wall. All hardware is field provided by
others.
4. Align the tabs on the rear of the unit with the slots
provided on the wall mounting plate (FIG. 2). The
bottom flange on the unit must also drop in the bottom
channel
of
the wall mounting plate. Replace the Tek
Screws to secure the unit in place.
Note
: If the holes provided on the bottom of the unit and the
bottom of the wall mounting plate do not align, remove the
unit and re-install. The holes on the bottom channel of the
wall mounted plate must be on the bottom.
FIG. 1
FIG. 2
5. Mount the product such that the discharge is 1” above
the opening and all obstacles. (FIG. 3)
Note:
If the product is installed higher than the
recommended 1” above the opening, then it must be
moved 3/8” away from the wall for every 1” that it is
moved up. Any void between the wall and the product
must be sealed, by others, to optimize performance.
WARNING
Precaution should be taken in explosive atmospheres.