Service Manual -
B-VMHxxAV-1
11. Test Operation
b. Remove the test cover. Add 2000ml of water to the tank
through the attached tube.
c. Turn on the main power switch and run the air
conditioner in COOL mode.
d. Listen to the sound of the drain pump to see if it makes
any unusual noises.
e. Check to see that the water is discharged. It may
take up to one minute before the unit begins to drain
depending on the drainpipe.
f. Make sure that there are no leaks in any of the piping.
g. Stop the air conditioner. Turn off the main power switch
and reinstall the test cover.
11. Test Operation
1. The test operation must be carried
out after the entire installation has been
completed.
2. Please confirm the following points
before the test operation.
•
The indoor unit and outdoor unit are installed prop-
erly.
•
Piping and wiring are properly connected.
•
Ensure that there are no obstacles near the inlet and
outlet of the unit that might cause poor perfor-
mance or product malfunction.
•
The refrigeration system does not leak.
•
The drainage system is unimpeded and draining to a
safe location.
•
The heating insulation is properly installed.
•
The grounding wires are properly connected
•
The length of the piping and the added refrigerant
stow capacity have been recorded.
•
The power voltage is the correct voltage for the air
conditioner.
CAUTION: Failure to perform the test run may result in unit
damage, property damage or personal injury.
3. Test Run Instructions
1. Open both the liquid and gas stop valves.
2. Turn on the main power switch and allow the unit to
warm up.
3. Set the air conditioner to COOL mode, and check the
following points.
Indoor unit
•
Double check to see if the room temperature is be-
ing registered correctly.
•
Ensure the manual buttons on the indoor unit works
properly.
•
Check to see that the drainage system is unimpeded
and draining smoothly.
•
Ensure there is no vibration or abnormal noise dur-
ing operation.
Outdoor unit
•
Check to see if the refrigeration system is leaking.
•
Make sure there is no vibration or abnormal noise
during operation.
•
Ensure the wind, noise, and water generated by the
unit do not disturb your neighbors or pose a safety
hazard.
4. Drainage Test
a. Ensure the drainpipe flows smoothly. New buildings
should perform this test before finishing the ceiling.
Содержание Comfort-Aire Century A-VMH18SV-1
Страница 10: ...Service Manual B VMHxxAV 1 Contents 1 Model Reference 2 2 External Appearance 3 Model Reference ...
Страница 30: ...Service Manual B VMHxxAV 1 ...
Страница 37: ...Service Manual B VMHxxAV 1 Outdoor Unit 3 3 Panel Plate X430 Square grille ...
Страница 38: ...Service Manual B VMHxxAV 1 Outdoor Unit 4 4 Panel Plate D30 Square grille ...
Страница 39: ...Service Manual B VMHxxAV 1 Outdoor Unit 5 5 2 Service Place Minimim 4 Recommended 12 ...
Страница 42: ...Service Manual B VMHxxAV 1 Outdoor Unit 8 8 A VMH18SV 1 A VMH24SV 1 ...
Страница 45: ...Service Manual B VMHxxAV 1 ...
Страница 103: ...Service Manual B VMHxxAV 1 Troubleshooting 15 ...