26
a)
b)
Fig. 19
4.5. Inspection of the lines placing
The packing employee will check the lines placing for correctness.
4.6. Placing of the canopy into the container
Risers of the harness are bent into the container. Attach the red threads with
strength 48 to 69 N to the red tape loops, sewn between the packaging flap
and the central part of the container (fig. 20).
Fig. 20
Содержание ATL-15
Страница 2: ...2...
Страница 4: ...4...
Страница 20: ...20 Fig 11 Fig 12...
Страница 25: ...25 Fig 18 a b c d e...
Страница 38: ...38...
Страница 39: ...39 The label completion and marking of the emergency parachute ATL 88 90 1A ATL 15...