FIND OUT MORE
y
marley.co.uk
21
20
Marley SolarTile
®
installation guide
INSTALLATION SEQUENCE
INSTALLATION SEQUENCE
10
11
Slide the lower gutter (7) between the two solar panels from the top. Fold the
tab at the bottom behind the sill flashing. Loop the gutter fixing strip (16) into
the slot on top of the gutter. Fix the strip to a batten with a nail.
Align the bottom corner of the lower gutter covers (8) with the bottom edge
of the solar panel and push the gutter covers into the gasket. Fold down the
retaining tabs.
TC
TC
Содержание F16-J
Страница 1: ...JUNE 2020 y SOLAR INSTALLATION GUIDE ...