Page 74 / 100
Technical Notice V1.0 / 01.09
11 Model CSW 900/1000/1300/1700
11.4
Commissioning
The unit has been checked, tuned and tested in
our workshops.
A.
Make the hydraulic and electrical connections.
B.
Fill the reservoir with liquid.
C.
Start up the machine (1).
D.
Check the rotation direction of the pump and the
exhaust fan.
11.5
Specific tuning
11.5.1 Draining the reservoir
A.
Put a container under the tap (2) or the drainage
plug located under the chiller.
B.
Open the drainage tap.
C.
Close the drainage tap once the reservoir is emp-
ty.
Fig. 11-4 : Engaging
(1)
Fig. 11-5 : Emptying cap
(2)
Содержание CSSW 50
Страница 1: ...INDUSTRIAL REFRIGERATION UNITS TECHNICAL NOTICE V1 0...
Страница 8: ...Page 8 100 Technical Notice V1 0 01 09 Table of contents...
Страница 14: ...Page 14 100 Technical Notice V1 0 01 09 1 Introduction...
Страница 32: ...Page 32 100 Technical Notice V1 0 01 09 4 Model CSW 100 150...
Страница 38: ...Page 38 100 Technical Notice V1 0 01 09 5 Model CSW 200 300...
Страница 44: ...Seite 44 100 Technical Notice V1 0 01 09 6 Model CSW 400...
Страница 90: ...Page 90 100 Technical Notice V1 0 01 09 12 Options...
Страница 99: ...Technical Notice V1 0 01 09 Page 99 100 100 Appendix 14 14 5 Compliance documents...