Market Forge Industries M24G Скачать руководство пользователя страница 6

4

INSTALLATION

Service Connections

GAS SERVICE CONNECTIONS: *

1.  The boiler is factory adjusted for a gas input of 200 

and 300K BTU/HR at the pressure indicated. Please 

read the rating plate behind the Lift-Off Front Panel. If 

this plate is marked for a different gas than that sup-

plied, notify your dealer immediately. Install an exter-

nal gas supply shut off valve in a visible and acces-

sible location. If the unit is placed at the minimum side 

clearances rather than the optimum side clearances, 

the only acceptable location for the gas supply shut 

off valve is under the unit in the space provided by 

the legs.

2.  Use new iron or steel pipe complying with the latest 

ANSI Standard for Wrought-Steel and Wrought-Iron 

Pipe, B36, properly threaded, reamed and free from 

chips, oil and dirt. If pipe dope is used, apply a moder-

ate amount leaving two end threads bare. Pipe dope 

must be resistant to LP gas. Connect the gas line into 

the bottom (inlet) side of the shutoff valve. The supply 

pressure must be at least 1” (25mm) water column 

higher than the manifold or regulator pressure for 

proper functioning of the regulator. If it is not check 

the supply pipe for blockage or excessive pressure 

drop and make necessary corrections.

3.  Perform a gas leak test of all newly-made joints, as 

well as those leading to the main gas control valve. 

Use a soap solution, DO NOT USE FLAME. Natural 

gas units are equipped with a pressure regulator fac-

tory adjusted to give 4” (102mm) water column mani-

fold pressure.

4.  Propane gas units are equipped with a pressure reg-

ulator, factory adjusted, to give 10” (254mm) water 

column manifold pressure.

5.  ONLY A LICENSED GAS FITTER SHOULD MAKE 

GAS LINE CONNECTIONS.

ELECTRIC SERVICE CONNECTION: *

Connect boiler controls to 110/120 volt AC, 60Hz, single 

phase branch circuit rated 15 amps capacity, using the 

three prong plug provided.

* Gas and Electrical connections should be made by li-

censed tradesmen only.

SERVICE CONNECTIONS

G

Gas Connection

 - 3/4” (19mm) NPT 200,000 BTU

G1 Gas Connection

 - 1” (25mm) NPT, 300,000 BTU

CW1 Cold Water 

- 3/8” (10mm) NPT for cold water to boiler. Cold 

water lines will have a maximum of 50 PSI (3.5kg/cw2) and 

a minimum of 25 PSI (1.8 kg/cw2) water pressure

CW2 Cold Water

 - 3/8” (10mm) NPT for cold water to condenser. 

Cold water lines will have a maximum of 50 PSI (3.5kg/cw2) 

and a minimum of 25 PSI (1.8 kg/cw2) water pressure.

D

Drain

 - Pipe full 2” (50mm) NPT to flush floor drain 

capable of receiving water flowing at a maximum rate of 

5 gallons (19 liters) per minute. DO NOT MAKE SOLID 

CONNECTION TO FLOOR DRAIN. 

EC Electrical Connection

 - 120 Volts AC, 60 Hz, single  

phase, and a 9 foot Power Cord/NEMA 5-15.

ST Steam Take-off 

- Connection for operation of adjacent 

steam powered equipment.

NOTE:  If equipment is installed where elevation exceeds 

2,000 feet (609.6 meters) above sea level, spec-

ify installation altitude so that proper gas orifices 

can be provided.

The only available space to supply utilities to the gas 

boiler is the 6” (152mm) space between the floor and the 

cabinet. 
Allow 3” (76mm) space from side wall and 6” (152mm) 

from real wall if adjoining walls are combustible.
PVC &  CPVC PIPE ARE NOT ACCEPTABLE MATERI-

ALS FOR DRAINS.
DRAIN LINE INSTALLATION: The drain port of the unit 

is marked with a colored tag and is located at the lower 

rear left side of the boiler as viewed from the front.  This 

exhaust line may be left open if the boiler has to be situ-

ated in a tiled floor depression or a tiled curb section that 

is  equipped  with  drain  facilities.    If this  is  not  the  case, 

then a  2” (51mm)  NPT drain line must be connected to 

divert the exhaust to the floor drain.  If it is necessary to  

use more than two elbows, increase the size of the waste 

line accordingly.

CAUTION:

 REMOTE KETTLE OPERATION If this boiler is 

feeding a remote kettle that will be more than 5 feet (1.5 

meters) away, consult factory before ordering.

Содержание M24G

Страница 1: ...ATED BOILERS INSTALLATION OPERATION MAINTENANCE 44 Lakeside Avenue Burlington Vermont 05401 USA Telephone 802 658 6600 Fax 802 864 0183 www mfii com PN 14 0307 Rev D 4 16 2016 Market Forge Industries Inc MODELS M24G M36G ...

Страница 2: ...Your Service Agency s Address Model Serial number Boiler installed by Installation checked by ...

Страница 3: ...PROMINENT LO CATION This information may be obtained by contacting your local gas supplier FOR YOUR SAFETY Do not store or use gasoline or other flammable vapors or liq uids in the vicinity of this or any other appliance The information contained in this manual is important for the prop er installation use and mainte nance of this boiler Adherence to these procedures and instruc tions will result ...

Страница 4: ...th water to the proper level and the fuel switch is turned ON the main gas valve will be activated allowing gas to flow to the main burners that will be ignited by the Spark Pilot When the boiler builds to its set pressure the pressure switch opens This will open the circuit to the gas valve that will stop the flow of gas to the main burners As the pressure in the boiler drops the pressure control...

Страница 5: ...rton will contain the legs If your model is received this way be sure to follow the installation instruction sheet packed with the legs LEVELING In order for the boiler to drain correctly it is important to use a level on cabinet top both left and right and front to back If not level adjust feet On compartment cookers check the interior shelves for level condition LOWER DEFLECTOR PLATE The lower d...

Страница 6: ...e three prong plug provided Gas and Electrical connections should be made by li censed tradesmen only SERVICE CONNECTIONS G Gas Connection 3 4 19mm NPT 200 000 BTU G1 Gas Connection 1 25mm NPT 300 000 BTU CW1 Cold Water 3 8 10mm NPT for cold water to boiler Cold water lines will have a maximum of 50 PSI 3 5kg cw2 and a minimum of 25 PSI 1 8 kg cw2 water pressure CW2 Cold Water 3 8 10mm NPT for col...

Страница 7: ... NOT UNDER ANY CIRCUMSTANCE CONNECT THE EXHAUST DRAIN LINE DIRECTLY TO A SEWER LINE Figure 2 WATER SUPPLY Good quality water feed is the responsibility of the owner Water quality must be within the following gen eral guidelines TDS 40 125 ppm Chlorides 25 ppm Silica 13 ppm pH 7 0 8 5 Chloramine 0 2 ppm Chlorine 0 2 ppm Hardness 35 100 ppm The best defense against poor water quality is a water trea...

Страница 8: ...0 15 minutes to allow the boiler to build pres sure to the desired operating level of 5 7 PSI DAILY SHUT DOWN AND CLEANING 1 STEP 1 Press ON OFF switch off This will drain the steam boiler 2 STEP 2 After steam boiler has completely drained repeat steps 1 2 water to remain in steam boiler until next daily use CAUTION BE SURE TO READ Disconnect The Power Supply to the boiler before servicing or clea...

Страница 9: ...and descaler replacement REPLACEMENT PARTS NEEDED TO COMPLETE THESE INSTRUCTIONS PART PART NO 1 Hand hole Cover Gasket 08 4415 1 Set of Rubber Brass Washers 90 0039 1 Probe Plate Gasket Gas Only 08 4413 1 Market Forge Cathodic Descaler all boilers new style 08 0049 1 Dynaseal Washer 10 1135 Cleaning Instructions 1 Move the HEAT and POWER switch to their OFF po sitions On electric models also turn ...

Страница 10: ...box Bring the boiler to operating pressure If a leak appears at the hand hole cover relieve the pres sure in the boiler and retighten the hex nut 8 Clean the water gauge glass as follows a Move the heat and power switch to their off posi tions This will allow the boiler to empty b Unscrew the fittings from both valves and slide them toward the center of the gauge glass Push the water gauge glass d...

Страница 11: ...etermining proper location for cleaner descaler to be added Read complete instructions thoroughly includ ing all warning and cautionary statements 1 Energize boiler and fill to operating level Figure 7 2 Energize heating circuit to pre heat unit Figure 8 3 AUTOMATIC After unit is pre heated cycle the pow er switch to the OFF position then immediately back to the ON position Figure 9 Figure 10 4 Re...

Страница 12: ... for cleaning Repeat twice This ad ditional 2 gallons of water will cause the low water probe to be immersed in cleaner descaler solution Replace access plug 11 After rinsing the container place tubing inside the bottle cover with shipping cap dispose of properly DO NOT REUSE CONTAINER 12 DO NOT ENERGIZE HEATERS Allow 2 hours for cleaning 13 After time has elapsed drain the boiler 14 Refill the bo...

Отзывы: