
9
MAINTENANCE
Cleaning the Boiler
APPLYING TOTAL CONCEPT DESCALER
Total Concept is designed to be used with water between
160°F to 200°F.
Preheating is required on the boiler to raise the water
temperature to the acceptable range. (160°F to 200°F).
Total Concept is a NSF listed nonfood product. This is
a liquid acid (nonmuriatic) product that works without
fumes, odors, and hazards associated with other harsh
chemicals. Product is also USDA approved.
BOILER TREATMENT CLEANING INSTRUCTIONS
After determining proper location for cleaner/descaler to
be added: Read complete instructions thoroughly; includ-
ing all warning and cautionary statements.
1. Energize boiler and fill to operating level.
Figure 7
2. Energize heating circuit to pre-heat unit.
Figure 8
3. AUTOMATIC - After unit is pre-heated, cycle the pow-
er switch to the OFF position then immediately back
to the ON position
Figure 9
Figure 10
4. Remove the shipping cap, replace it with the pouring
cap. Cut the tip of the pouring cap at the first notch to
a 45
°
angle.
Figure 11
5. Install the tubing firmly over the tip of the pouring cap.
Figure 12
6. Energize compartment to release steam pressure in
boiler to “0” PSI before removing pipe plug.