
15
APPLICATION INSTRUCTIONS FOR TOTAL CONCEPT CLEANING OF BOILER
SIZE: 1 Gallon PART NUMBER: 20 - 0307
GENERAL NOTES:
Market Forge R has two basic types of boilers; one
has an automatic drain valve, the other has a man-
ual drain valve. To determine which type you have,
open cabinet doors and you will see a control box
with two switches and an indicator light. The instruc
-
tion label on the control box will identify the boiler
as being either automatic or manual. Those boilers
designated as being automatic must be energized
in order to close the drain valve.
Total Concept is designed to be used with water be
-
tween 160°F to 200°F.
Preheating is required on both automatic and man
-
ual boilers to raise the water temperature to the ac
-
ceptable range. (160°F to 200°F).
For manual boilers, make certain drain valve is
tightly closed.
On Market Forged boilers manufactured after 8/84;
your unit is equipped with an access plug in the
steam header line. This location should be used
to add cleaner/descaler to boiler chamber during
maintenance.
On Market Forged boilers manufactured before
8/84; access to boiler chamber should be gained
through either the vent-rite or the pressure relief
valve.
Total Concept is a NSF listed nonfood product. This
is a liquid acid (nonmuriatic) product that works
without fumes, odors, and hazards associated with
other harsh chemicals.
BOILER TREATMENT CLEANING INSTRUC-
TIONS:
After determining proper location for cleaner/des
-
caler to be added: Read complete instructions thor
-
oughly; including all warning and cautionary state
-
ments.
Fig. 1
1
. Energize boiler and fill to operating level.
Fig. 2
2. Energize heating circuit to pre-heat unit.
Fig. 3
Fig. 4
3. AUTOMATIC - After unit is pre-heated, cycle the
power switch to the OFF position then immedi
-
ately back to the ON position.
4. Remove the shipping cap, replace it with the
pouring cap. Cut the tip of the pouring cap at the
first notch to a 45
o
angle.
APPLICATION INSTRUCTIONS
____________________________________________________________________________
Содержание M24E24A
Страница 31: ......