![Mark GSW+ 30 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/mark/gsw-30/gsw-30_technical-manual_1727518010.webp)
10
3 Installation
The installation of the gas units must be done by qualified and competent practitioners. The method of
installation depends on the area, volume, ventilation facilities and the possibilities that exist for flue and
combustion air. This is to be determined by the installer.
3.1
General rules
The condensing unit can be installed directly in the to be heated room. The installation must comply
with national and local regulations, particularly in the field of applied fuels. The installer must abide to the
regulations in force. If in doubt, ask for information with the control- and safety regulators.
Aeration
Areas where a device that works on gas is placed, must have a permanent ventilation in accordance with
the rules in force in the country of installation.
Drainage of the condensate
The air heater must be equipped with the included siphon to drain the condense water. It is a part of
the safety system, each replacement by another unapproved type is strictly prohibited. The drainage of
the condensate must be carried out in accordance with the applicable requirements in the country of
installation.
Gas connection
Before connecting the unit, you must make sure that the local gas supply (type of gas, pressure) match the
settings of the unit that must be installed.
Note: minimum distances are essential for the maintenance and safety of the unit.
500 mm
200 mm
300 mm
2500 mm
Содержание GSW+ 30
Страница 1: ...Technical manual EN MARK GSW 0660302_R07...
Страница 19: ...19 Connection diagram Condensing air heater Maintenance switch 230Vac Comtherm Room sensor C A B D A B C D...
Страница 20: ...20 Supply Comtherm Connector JP 18 RS 485 Bus connector...
Страница 29: ...29...
Страница 30: ...30...
Страница 31: ...31...