Marimba One Izzy Скачать руководство пользователя страница 8

  21 ͏  � 

  22 ͏  � 

  23 ͏  � 

051214 - REV. A 

PAGE 7 0F 11

POSITION BARS ON RAILS

Move each bar into its correct 

position, making sure that the cord 

rests in the Jacks between each 

bar. 

Wrap the bar cord around the 

Corner jacks at the treble end.

SECURE BARS TO RAIL

Once all the bars are in place, from the bass 

end pull the cord taught (pulling evenly on each 

end of the cord at the same time), loop the cord 

around the corner jacks and hook the springs 

together.

bass end close-up

FOLLOW SAME PROCEDURE FOR ACCIDENTAL BARS

 

The bars go over every resonator that is plugged. 

When you look from the top you can see the floor through  

the resonators without bars over them.

treble end close-up

corner jacks

rail jacks

tuning arch

treble end close-up

Содержание Izzy

Страница 1: ...Marimba One Izzy OWNER S MANUAL combination wood and aluminum rails www marimbaone com tel 707 822 9570 fax 707 822 6256 901 O St Suite D Arcata CA 95521 USA...

Страница 2: ...Accidental Bars Natural Resonator Bank Girder Girder FOR ASSEMBLY YOU WILL NEED 1 KEEP These instructions for future reference ASSEMBLY INSTRUCTIONS OWNER S MANUAL CAREFULLY UNPACK YOUR CRATE Compare...

Страница 3: ...knob girder knob girder end girder end frame hook frame hook bolt thread girder knob nut REPEAT STEPS FOR TREBLE END OF FRAME SEAT GIRDER ENDS ONTO HOOKS Have your assistant hold the bass end frame up...

Страница 4: ...rails are folded the number appears in the end grain of the wood 9 10 IDENTIFY RAIL 2 UNFOLD RAIL Slide the joiner tube over the girder tubes until the joiner tube can go no further Secure the joiner...

Страница 5: ...oint on resonator bank Rails 1 and 2 support the natural bars and resonators INSTALL RAIL 2 Bass End 1 2 3 4 Treble End IDENTIFY NATURAL RESONATOR BANK UNFOLD RESONATOR Position yourself with the bass...

Страница 6: ...IDENTAL RESONATOR BANK Repeat steps for the second resonator bank Each person holds the ends of the resonator bank Lower the bank onto the frame BEHIND the girders INSTALL RAILS 1 AND 4 Lower rail 1 a...

Страница 7: ...bundle With your assistant at one end and you at the other lift the natural bars and lay them over rails 1 and 2 Be sure the rail is fully engaged onto the flexible pins in the end frame Lower rail in...

Страница 8: ...are in place from the bass end pull the cord taught pulling evenly on each end of the cord at the same time loop the cord around the corner jacks and hook the springs together bass end close up FOLLO...

Страница 9: ...d use the cleats behind the springs to hold the slack in the cord cleat cleat hooks spring bar cord UNHOOK SPRINGS spring NOTE In time the cord may become loose again Do not exceed a maximum of THREE...

Страница 10: ...D RELEASE LEVERS ONE AT A TIME ALWAYS KEEP MARIMBA ENDS AT EQUAL HEIGHTS Locate the height gauges on the inside edges of frame 1 Raise or lower the end frame Use guages to ensure that both ends are al...

Страница 11: ...ll damage the finish and contaminate the wood THE MARIMBA SHOULD ONLY BE LIFTED BY THE END FRAMES Lifting by the rails will cause the rails to come out of their slots When the marimba is moved pass VE...

Страница 12: ...o schedule the replacement and refer to the bars as shown on this bar chart and include your serial number in your correspondence Keep your old bars until you receive new ones from us That way you re...

Отзывы: