The point of irrigation of the burning products is at 65º С and for this reason the products temperature on the 

heating surfaces must not drop below 65º С

If in the fuel reserve chamber condensation is formed, that indicates the presence of excessively high water 

content in the fuel (humid fuel). In such cases condensation may occur even at boiler water temperatures 

above 65º С

The tar is formed in similar circumstances (low output, low temperature) and also in wrong combustion ad-

justment – too little oxygen. The tar accumulates on the bottom of the gas paths and impedes the removal of 

the cleaning lid.

The tar can be cleaned in warm state only. For the purpose do as follows: 

• 

It is best to heat up the boiler with some soft wood.

• 

When a 90º С temperature is reached close all valves of the heating components.

• 

Pull out the cleaning lid and hit several times with hammer.

• 

Remove the tar from the floor and the heating surfaces with a cleaning scoop.

7. Inspection and maintenance of the heating boiler

Why regular maintenance is important?

These are the reasons why a regular maintenance of the heating installations is required:

• 

To keep a high energy conversion efficiency and to ensure an economic functioning of the heating in-

stallation (low fuel consumption);

• 

Ensuring a high operational safety;

• 

Ensuring a high ecological combustion;

Offer Your client an annual contract for revision and maintenance. Use original spare parts only.

Cleaning the heating installation

• 

Check the heating boiler and clean if needed.

• 

Check and clean the exhaust gas pipe.

Heating installation pressure check

The pointer of the manometer must be above the red one. The red pointer of the manometer must be set to the 

required working pressure.

Info: Set a working pressure of at least 1 bar.

• 

Check the working pressure of the heating installation. If the manometer pointer is under the red point-

er, then the working pressure is too low. Water must be added.

Instruction!!! Installation malfunctions due to frequent water adding.

When a frequent water addition is performed, depending on the condition of the water, the heating installa-

tion can be damaged due to corrosion and limestone accumulation.

• 

Ensure that the heating installation is air tight;

• 

Check the insulation of the heating installation and the capability of the enlarging pot;

• 

Installation malfunctions due to tension in the material from to temperature differences.

• 

Fill the heating installation in a cold state only (the incoming temperature must not be exceeding 40º С).

• 

Add water through the loading and unloading valve.

• 

Air tight the heating installation.

• 

Check the working pressure again.

8. Thermal safety of the flow check

The thermal safety guard of the flow ensures a safe functioning of the heating boiler in case of system failure 

if the system cannot lead the heat of the heating boiler out by itself. A malfunction may occur, for example, 

in case of a frozen heating system, water circulation failure etc. For proper functioning of the thermal safety 

guard a sufficient pressure and cooling water are required. Pressure of at least 2 bar and a 11 l/min water debit 

is required.

• 

Check the thermostatic valve of the safety heat exchanger annually according to the manufacturer’s data.

If the check was not successful – the thermostatic valve doesn’t open the flow of the cooling water, or the per-

meability of the thermostatic valve is too low – you must replace the thermostatic valve.

Troubleshooting

In case of malfunction attempt repair or inform the heating specialist. As a user of the installation you can only 

attempt maintenance activities like changing parts of the grills, the fire-clay bricks or the insulation tape. Use 

original spare parts only.

Содержание CB 35

Страница 1: ...Combined Boiler MARELI CB 35 Assembly and exploitation manual Mareli Systems...

Страница 2: ...f this series are designed to uti lize solid fuel wood coals It has a welded steel con struction The resulting heat is absorbed by the heat ex change surface of the boiler body and transmitted the hea...

Страница 3: ...is to be mounted The funnel with an outer diameter of F145 is situated in the upper rear part of the boiler and leads off the smoke gasses through the chimney The steel heat exchanger is isolated wit...

Страница 4: ...onnecting the safety heat exchanger Filling the heating installation and density check 4 Instructions for connecting the air supply and exhaust gases Making the connection with the chimney Keep in min...

Страница 5: ...joints to the water tank of which can not be closed are mounted Close the connection between the enlarging pot and the system by closing the valve Open the mixing and the stopping valves from the wate...

Страница 6: ...low and this results in better gas efficiency For this purpose pull the valve lever at the rear side of the heating boiler to a vertical po sition after 10 15 minutes Info An excessive air supply may...

Страница 7: ...may freeze due to low temperatures If possible leave the heating installation constantly running Protect the heating installation from freezing by eventually draining the heating installation on the...

Страница 8: ...ressure of at least 1 bar Check the working pressure of the heating installation If the manometer pointer is under the red point er then the working pressure is too low Water must be added Instruction...

Страница 9: ...tat open flame return from the brazier Er07 Encoder Error The error may occur due to lack signal from Encoder Er08 Encoder Error The error can occur due to problems of adjustment of the number of revo...

Страница 10: ...ond case the user selects the desired power On the left side of the display are signalled the combustion modality A automatic combustion M manual combustion and the working power of the system Recipe...

Страница 11: ...day at the desired time Ex 6 30 The system turns on at 20 30 on Tuesday and turns off at 6 30 on Wednesday Weekly The programs are the same for all days of the week Week end Choose between Monday Fri...

Страница 12: ...12 Mareli Systems WIRING DIAGRAM SMB 50...

Страница 13: ...13 Mareli Systems WIRING DIAGRAM PB 40 52...

Страница 14: ...14 Mareli Systems...

Страница 15: ...15 Mareli Systems...

Страница 16: ...hey are due to printing or transcription errors We reserve the right to make any change that appears to be necessary or useful without harm the essential characteristics Mareli Systems MareliSystems I...

Отзывы: