 If the lid doesn’t come off this means that the chamber is covered with tar. Hit the cleaning lid cautiously 

with a hammer several times.

• 

Clean the walls of the heating surfaces, the combustion chamber and the reserve fuel chamber with a 

cleaning scoop.

• 

Clean the grills with an ash knife.

• 

Gather the soot and the ashes in the ash container.

• 

We recommend annual revision of the heating boiler, performed by an authorized heating firm and 

check of the system’s technical data, for example exhaust gas temperature.

• 

Open the filling valve and the top plate.

• 

Pull the ignition valve. This ensures the gas access to the paths and walls of the heating boiler.

• 

Pull out the lid of the cleaning hole from the combustion chamber so the combustion waste can fall freely 

in the ash container.

6. Using the turbulator plate

The turbulator plate creates vortex in the paths of the heating gas and thus 

resulting in higher efficiency, especially during the winter. In the begin-

ning of the heating season and during the intermediate seasons we recom-

mend removal of the turbulator plate of the heating boiler

• 

At -7º С outer temperature re-install the turbulator plate into the 

heating boiler.

Shutting down the heating boiler

To shut down the boiler let the fire to extinguish completely. Acceleration 

of the process is not recommended.
Instruction!!! Installation malfunction due to freezing.

When the heating installation is not operating it may freeze due to low 

temperatures.

• 

If possible, leave the heating installation constantly running.

• 

Protect the heating installation from freezing by eventually draining 

the heating installation on the lowest point.

Temporary shut-down of heating boiler

• 

Clean the grill and empty the ash container.

• 

Clean the supporting surfaces of the loading valve and the ash cham-

ber.

• 

Close the ash door and the loading valve.

Long term shut-down of the heating boiler

For a long term shut-down of the heating boiler (for example in the end of the heating season) carefully clean 

the heating boiler in order to avoid corrosion.

Emergency shut down of the heating boiler

In case of explosion hazard, fire, burning gases or vapours the combustion process can be terminated by using 

water.

• 

Carefully open the loading door in order to avoid incoming flames.

• 

Extinguish the fire with water.

Avoiding condensation and tar forming

Excessively low heating output may lead to condensation upon the heating surfaces.

The condensation is leaking down into the ash container.

• 

Check the indications of the thermometer/manometer to ensure that the working temperature of the 

boiler water remains above 65º С.

• 

Heat up the heating boiler multiple times. Remove the turbulator plate for the purpose. By the soot accu-

mulation, which is formed during a normal operating process, the condensation risk reduces.

Содержание CB 35

Страница 1: ...Combined Boiler MARELI CB 35 Assembly and exploitation manual Mareli Systems...

Страница 2: ...f this series are designed to uti lize solid fuel wood coals It has a welded steel con struction The resulting heat is absorbed by the heat ex change surface of the boiler body and transmitted the hea...

Страница 3: ...is to be mounted The funnel with an outer diameter of F145 is situated in the upper rear part of the boiler and leads off the smoke gasses through the chimney The steel heat exchanger is isolated wit...

Страница 4: ...onnecting the safety heat exchanger Filling the heating installation and density check 4 Instructions for connecting the air supply and exhaust gases Making the connection with the chimney Keep in min...

Страница 5: ...joints to the water tank of which can not be closed are mounted Close the connection between the enlarging pot and the system by closing the valve Open the mixing and the stopping valves from the wate...

Страница 6: ...low and this results in better gas efficiency For this purpose pull the valve lever at the rear side of the heating boiler to a vertical po sition after 10 15 minutes Info An excessive air supply may...

Страница 7: ...may freeze due to low temperatures If possible leave the heating installation constantly running Protect the heating installation from freezing by eventually draining the heating installation on the...

Страница 8: ...ressure of at least 1 bar Check the working pressure of the heating installation If the manometer pointer is under the red point er then the working pressure is too low Water must be added Instruction...

Страница 9: ...tat open flame return from the brazier Er07 Encoder Error The error may occur due to lack signal from Encoder Er08 Encoder Error The error can occur due to problems of adjustment of the number of revo...

Страница 10: ...ond case the user selects the desired power On the left side of the display are signalled the combustion modality A automatic combustion M manual combustion and the working power of the system Recipe...

Страница 11: ...day at the desired time Ex 6 30 The system turns on at 20 30 on Tuesday and turns off at 6 30 on Wednesday Weekly The programs are the same for all days of the week Week end Choose between Monday Fri...

Страница 12: ...12 Mareli Systems WIRING DIAGRAM SMB 50...

Страница 13: ...13 Mareli Systems WIRING DIAGRAM PB 40 52...

Страница 14: ...14 Mareli Systems...

Страница 15: ...15 Mareli Systems...

Страница 16: ...hey are due to printing or transcription errors We reserve the right to make any change that appears to be necessary or useful without harm the essential characteristics Mareli Systems MareliSystems I...

Отзывы: