Marecoluce Challenge Solar Скачать руководство пользователя страница 3

3

Ø60mm

2.5Nm

(1)

(2)

(3)

(6)

Stud Solar 1

Stud Solar 2

(1)

(2)

(3)

2

3

(5)

(Fig 1)

(1)

(3)

(2)

1

2.5 Nm

4

STUD SOLAR

STUD 

SOLAR

2.5 Nm

Connection of main supply cable (if available)

The main supply cable coming out of the pole must be connected as 
follows:
Clamp mark F Live wire
Clamp mark N Neutral wire
Clamp mark T Ground wire

Movement sensor: Stud Solar 1/2 is pre-set for the connection of the 
remote sensor through a terminal block placed inside the electrical 
compartment. The sensor must be in "clean contact" with a supply 
voltage between 12VDC and 17VDC

Untighten the screw 

(1)

Loosen the screw 

(2)

Remove the gear-tray cover 

(3)

Insert Stud Solar 1 or Stud Solar 2 into the 
pole by tightening the dowels 

(6)

 (2,5 Nm 

strength)
Place the battery 

(5)

 (included) into the 

compartment by placing the connectors in 
the correct position 

(see pic.1)

.

Reposition the gear-tray cover 

(3)

 

Tighten the screws 

(1 and 2)

*LEDs position in case 
of grid connection

Installation of the fitting

*Grid connection: Pag. 7

Electronic circuit board pre-installed  
and factory set (for programming 
modes see pag.6-8)

User's manual

Содержание Challenge Solar

Страница 1: ...lation of the fitting Pag 3 Challenge Solar installation of the fitting Pag 4 Electronic circuit board Deva Solar and Stud Solar Pag 6 Programming Deva Solar Pag 7 Programming Stud Solar Pag 8 Program...

Страница 2: ...icollars of the panel Position the panel 3 on the brackets 4 of the pole top and tighten the screws 2 of the semicollars Open the door of the battery box by using the key included Place the battery 6...

Страница 3: ...lectrical compartment The sensor must be in clean contact with a supply voltage between 12VDC and 17VDC Untighten the screw 1 Loosen the screw 2 Remove the gear tray cover 3 Insert Stud Solar 1 or Stu...

Страница 4: ...X 0 8 Nm 1b 5 7 2 5 Nm 3SX SX DX 2 8 9 8 1 24 24LL 36 2 5 Nm CHALLENGE SOLAR CHALLENGE SOLAR Electronic circuit board pre installed and factory set for programming modes see pag 8 9 10 Installation of...

Страница 5: ...G the luminaires 1x60W 2x30W 1x90W have n 2 supply cables connect these two supply cables together first then connect them to the terminal block Position the pole top without the solar panels on the t...

Страница 6: ...f the increased luminosity 1 2 or 3 minutes SMART In this mode the luminosity of the LEDs is variable Priority is given to battery charge this calculated each night based on the energy transferred fro...

Страница 7: ...the increased luminosity 1 2 or 3 minutes SMART In this mode the luminosity of the LEDs is variable Priority is given to battery charge this calculated each night based on the energy transferred from...

Страница 8: ...ation OFF OFF 8 hours OFF ON 10 hours ON OFF 4 hours at sunset and 2 hours before sunrise ON ON from sunset to sunrise Dip 5 LEDs at 100 luminosity if the system connects to the grid OFF Connected ON...

Страница 9: ...0 and the time for the movement sensor is set to 2 minutes Dip 1 Battery duration SMART mode OFF 3 nights duration without recharging ON 2 nights duration without recharging Dip 2 Programming mode OFF...

Страница 10: ...y has insufficient charge to switch to light up the product the ECB remains in this operating mode up until the end of the pre set light up time which can be set up via dip switch 4 flashes LEDs off a...

Страница 11: ...EDs for displaying the state of charge red yellow green1 and green 2 3 Terminal block for connecting the solar panel 4 Terminal block for connecting the battery 5 Terminal block for connection the lum...

Страница 12: ...ammed for an 8 hours operation to change the setting follow the instructions of PA RC100 controller The 5 minutes On Off delay has been set to avoid that the luminaires switch on off if the panels are...

Страница 13: ...on Check the battery and replace it if necessary Luminaires cannot be operating info LED flashing red green Luminaires output is switched off due to excessive battery voltage The luminaires output aut...

Страница 14: ...g should be carried out while panel is cool either in early morning or in late evening Cleaning consists in washing the panels with water and gentle detergents non abrasive by taking care to avoid str...

Страница 15: ...lation The product must be installed according to the supplied installation instructions For all the solar luminaires is required a periodical maintenance including the following steps To clean the so...

Страница 16: ...47032 Bertinoro FC Italia Via S Croce 121 z i tel 39 0543 4687 fax 39 0543 449051 info marecoluce it marecoluce it...

Отзывы: