![Marco Ecoboiler WMPB3 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/marco/ecoboiler-wmpb3/ecoboiler-wmpb3_service-manual_1726495004.webp)
Service Manual Ecoboiler wallmount 1000671 100676 061010
Page 4 of 18
3.
BASIC INSTRUCTIONS:
3.1.
INSTALLATION DETAILS:
Electrical installation:
o
2.4kW
o
Suitable cabling and fusing for a 2.4-3 kW circuit.
o
Ensure the machine is fully earthed.
Plumbing ins ta llation proce dure:
Note:
Marco recommend that this machine be positioned over a counter with a drainage facility.
Marco cannot be held responsible for any flood damages.
Mains water pressure required (limits): 5-50psi (35-345kPa)
Fit a stop Valve on a cold water line and attach a 3/4" BSP male fitting,
(e.g. 3/4" x 1/2" 311 or washing machine type stop valve).
Connect straight tailpiece of the inlet hose to the stop valve fitting. Make sure that the pre-
attached sealing washer is fitted.
Turn on the water to flush any impurities, dust etc from the inlet hose and water pipe. Allow
several litres through.
Connect the hose to the inlet valve of the boiler (again 3/4" BSP). The orientantion of the
tail piece will vary depending on whether machine is plumbed at the rear or at the
underside.
o
When the machine is plumbed from the rear , connect right-angled tailpiece to the
inlet valve of the boiler (again ¾” BSP)
o
When the machine is plumbed from the underside , connect non-angled tailpiece to
the inlet valve of
the boiler (again ¾” BSP).
Make sure the sealing washer is fitted here also.
Turn on water and check for leaks.
3.2.
OPERATION:
Check that all installation procedures have been carried out.
Ensure water valve is on and there is power to the appliance.
Th
e “Ready/Status” light will cycle two red flashes while the
machine is filling to the safe level.
After this amount of water has heated to about 96ºC the boiler
will draw more water in until the temperature drops by 1 or 2
degrees. The boiler will then heat again. This heat fill cycle
continues until the boiler is full.
Whilst the machine is above the safe level and filling, the
“Ready/Status” light will remain blank.
The “Ready/Status” light will glow green when the machine is
both full and up to normal operating temperature.
The boiler is now ready for use.
NOTE:
Because the boiler is electronically controlled no priming is necessary.
The element cannot switch on until a safe level of water is reached.
Ready/Status
Indicator
Power
Button
Ecomode
Button