9000 R Series IP Recorder with RAID Installation Guide
25
Chapter 3
Unit Setup
This section of the guide provides instructions for setting up the unit. It includes the following tasks:
•
“Mounting the Recorder” on page 26
•
“Replacing a Hard Drive” on page 27
•
“Replacing a Redundant Power Supply Module” on page 29
•
“Turning the Recorder On and Off” on page 31
Once the preliminary setup is complete, specify the recorder’s initial configuration using the unit’s
provisioning interface. For more information, see the
Provisioning Interface Technical Instructions
.
Then, specify basic device configurations using the March Networks Administrator Console. The
Administrator Console application is included on the provided software DVD. For more information,
see the
Administrator Console User Manual
, available for download from the March Networks
Partner Portal website.