49
4. Install the mounting bolts that secure the
generator to the base.
5. For two bearing generators, assemble the
coupling halves or sheave belts between the
generator and the prime mover. (Follow the
coupling manufacturer’s instructions for
assembly and alignment.)
6. Connect all conduits and ducting to the
conduit box.
7. Connect all external wiring to the
generator inside the conduit box.
8. Check the exciter air gap (the gap
between exciter armature and stator) by
inserting a .010 inch feeler gauge in the gap
and rotating around the armature diameter to
ensure the minimum air gap is available.
(See Figure 80.) If the feeler gauge cannot
be rotated full revolution, then check for a
“cocked" exciter stator or loose stator
mounting screws.
Figure 6-80
NOTE:
On single bearing units, the exciter
air gap cannot be checked properly until the
generator is mounted to the prime mover.
9. Install the conduit box covers.