20.03.2009
4
Assembly
1.
Screw the applicator unit support stand (A) together with
the stand foot (B).
2.
Screw the spray hood together with the height adjustment
(K) and the unit support beam (C).
3.
Connect the electrical plug connectors (D) together.
4.
Screw the flow rate control (E) onto the unit support beam
(C).
5.
Screw the handle bar (G) together with the handle bar
extension (F)
6.
Insert the handle bar extension (F) into the unit support
beam (C) and tighten securely.
7.
Slide the powerpack (H) into the designated bracket on
the unit support beam (C) and tighten securely.
8.
Insert the phone jack (I) into the plug socket on the
powerpack (H).
9.
Attach the hose (J) onto the lower side of the flow rate
control (E).
Metering table
Roundup UltraMax application rate at 20 °C
Roundup
UltraMax
Metering
adjustment
knob
position
Required output volume
in ml per atomiser
with 50 wheel revolutions
2 l/ha
3 l/ha
E
H
approx. 6.3
approx. 9.5
Checking the output volume
1.
Place an underlay (e.g. cardboard or paper) on the
ground and prop up the unit on stands.
2.
Fill the chemical tank with herbicide - undiluted.
3.
Remove the hose from the lower side of the flow rate
control and place a measuring cup underneath.
4.
Open the shut-off valve, initially setting the metering
adjustment knob to the maximum flow rate and
simultaneously turning the wheel; wait until the
chemical solution is evenly applied.
5.
Set the chemical solution volume according to the
output table.
6.
Volume calibration: Collect the chemical solution from
50 wheel revolutions into a measuring cup. If the
desired volume is not reached, set a larger or a
smaller volume with the pump metering adjustment
knob.
7.
Perform volume calibration again.
8.
Reconnect the hose on the lower side of the flow rate
control.
9.
The unit is now ready for deployment.
Maximum allowable wheel pressure 3.5 bar
Shut-off valve position closed
MANKAR-P 30-50 FLEX
MANKAR-P 50
Spray hood 30-50 FLEX