Ice Machine Operation
Section 3
3-4
Part Number 80-1559-3
Operational Checks
GENERAL
Manitowoc ice machines are factory-operated and
adjusted before shipment. Normally, new installations do
not require any adjustment.
To ensure proper operation, always follow the
Operational Checks:
•
when starting the ice machine for the first time
•
after a prolonged out of service period
•
after cleaning and sanitizing
NOTE: Routine adjustments and maintenance
procedures are not covered by the warranty.
WATER LEVEL
The water level sensor is set to maintain the proper
water level above the water pump housing. The water
level is not adjustable. If the water level is incorrect,
check the water level probe for damage (probe bent,
etc.). Repair or replace the probe as necessary.
ICE THICKNESS CHECK
The ice thickness probe is factory-set to maintain the ice
bridge thickness at 1/8" (.32 cm).
NOTE: Make sure the water curtain is in place when
performing this check. It prevents water from splashing
out of the water trough.
1. Inspect the bridge connecting the cubes. It should
be about 1/8" (.32 cm) thick.
2. If adjustment is necessary, turn the ice thickness
probe adjustment screw clockwise to increase
bridge thickness, counterclockwise to decrease
bridge thickness.
Ice Thickness Check
3. Make sure the ice thickness probe wire and the
bracket do not restrict movement of the probe.
Water Level Probe Location
SV3132
ADJUSTING SCREW
1/8” ICE BRIDGE THICKNESS
Содержание S1000M
Страница 24: ...Ice Machine Operation Section 3 3 6 Part Number 80 1559 3 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 92: ...Refrigeration System Section 7 7 26 Part Number 80 1559 3 Figure 7 10 Using Pinch Off Tool SV1406 ...
Страница 97: ...Section 7 Refrigeration System Part Number 80 1559 3 7 31 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 98: ...Refrigeration System Section 7 7 32 Part Number 80 1559 3 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 99: ......