![Manitowoc National Crane NBT30H-2 Скачать руководство пользователя страница 106](http://html.mh-extra.com/html/manitowoc/national-crane-nbt30h-2/national-crane-nbt30h-2_service-manual_701273106.webp)
BOOM MAINTENANCE
NBT30H-2 SERVICE MANUAL
4-14
03-20-2019 Control # 613-06
The fourth section should have moved out.
4.
Tightening until the extension gap between the third and
fourth section is equal to the extension gap between the
second and third section.
Retraction
1.
Measure the retraction gaps between the second and
third section and the third and fourth section.
If the retraction gap is greater between the third and fourth
section than the retraction gap between the second and third
section;
2.
Tighten the
432
retract cable located at the front bottom
of the second section the difference in the retraction gap
measurements.
3.
Extend and retract the boom a few times and then
repeat measuring the retraction gaps.
The fourth section should have moved in.
4.
Tightening until the retraction gap between the third and
fourth section is equal to the retraction gap between the
second and third section.
At this time the all extendable sections should extend and
r e t r a c t e q u a l l y a n d b o t t o m o u t a g a i n s t t h e s t o ps
simultaneously.
4- Section Boom w/ 1 Stage Cylinder Cable Positioning
Cable Tightening Sequence 4 Section Boom with (1)
Stage Extend Cylinder
Boom must be in horizontal position when adjusting cable
tension (See Figure 4-21.) Retract boom fully ensuring
sections are bottomed out on section stops. Ensure all
sections are fully bottomed out and do not spring
back.(Reference Tensioning Setup Procedure)
321 and 123 cable balancing
Extension
1.
Measure the extension gaps between the first and
second section and the second and third section.
If the extension gap between second and third section is less
than the extension gap between the first and second section;
2.
Tighten
123
extend cable located at the back top of the
base section the difference in the extension gap
measurements.
3.
Extend and retract the boom a few times and then
repeat measuring the extension gaps.
The third section should have moved out.
4.
Tightening until the extension gap between the first and
second section and the extension gap between the
second and the third are equal.
Retraction
1.
Measure the retraction gaps between the first and
second section and the second and third section.
If the retraction gap is greater between the second and third
section than the retraction gap between the first and second
section;
2.
Tighten the
321
retract cable located at the front bottom
of the base section the difference in the retraction gap
measurements.
3.
Extend and retract the boom a few times and then
repeat measuring the retraction gaps.
The third section should have moved in.
8860-3
FIGURE 4-21
1/2/3 EXTEND
2/3/4 EXTEND
4th STAGE
4/3/2 RETRACT
3/2/1 RETRACT
3RD STAGE
2ND STAGE
1ST STAGE
BASE
TIP
Содержание National Crane NBT30H-2
Страница 1: ...Service Manual National Crane NBT30H 2 ...
Страница 2: ......
Страница 40: ...1 30 03 20 2019 Control 613 06 INTRODUCTION NBT30H 2 SERVICE MANUAL ...
Страница 92: ...ELECTRIC SYSTEM NBT30H 2 SERVICE MANUAL 3 24 03 20 2019 Control 613 06 ...
Страница 110: ...BOOM MAINTENANCE NBT30H 2 SERVICE MANUAL 4 18 03 20 2019 Control 613 06 ...
Страница 132: ...SWING NBT30H 2 SERVICE MANUAL 6 14 03 20 2019 Control 613 06 ...
Страница 142: ...OUTRIGGERS NBT30H 2 SERVICE MANUAL 7 10 03 20 2019 Control 613 06 ...
Страница 158: ...LUBRICATION NBT30H 2 SERVICE MANUAL 8 16 03 20 2019 Control 613 06 ...
Страница 190: ...SCHEMATICS NBT30H 2 SERVICE MANUAL 10 2 ...
Страница 193: ......
Страница 194: ......