National Crane
PUBLISHED 04-26-2019 CONTROL # 113-09
3-7
600E2 OPERATOR MANUAL
OPERATING CONTROLS AND PROCEDURES
3
OPTIONAL HOIST BURST OF SPEED (BOS)
The “Burst of Speed” increases hoist line speed 50% over
normal operation by diverting oil from the multi-bank control
valve to the hoist valve.
The “BOS” is engaged by operating the hoist control valve
lever while pulling up on the BOS handle below the hoist
knob. The “BOS” feature should only be operated in a
temporary manner to reduce oil heat build up, prevent truck
PTO overloading, and provide independent operation of the
crane and hoist (normal hoist speed will not decrease when
crane functions are used). If the “BOS” feature is run
continuously or with an overload, damage to the crane or
truck could occur. To start the “BOS” smoothly, first pull up on
the BOS handle then operate the hoist lever. To stop the
“BOS” smoothly, return the hoist lever to its neutral position
then release the BOS handle.
.
ANTI-TWO BLOCK (A2B) SYSTEM
With untrained or inexperienced or distracted operators, two
blocking the hoist cable is a very real possibility. When the
hoist cable and end attachments contact the underside of the
sheave case, whether by hoisting up or extending the boom
without paying out the hoist cable, the hoist cable can be
damaged by crimping or over tensioning.
The A2B system provided on your National Crane can help
prevent cable damage by sensing the position of the hoist
cable end attachments with respect to the sheave case and
disabling the functions that can cause a two block condition.
The A2B system consists of normally open, work port
unloader valves in the main and hoist control valves. When
the cartridge solenoid is energized, the crane functions
normally, when de-energized, the oil to the boom extend,
boom down, and hoist up crane functions are diverted to
tank. These solenoids are controlled by a limit switch, which
is attached to the boom or extension sheave case. This
switch is held in the closed position by a chain suspended
weight. The weight, which is looped around the hoist cable,
causes the contacts to remain closed until the hoist cable
end attachments contact the weight and release the tension
on the switch. At this point the contacts in the switch open,
breaking electrical continuity through the circuit provided by
the internal A2B cord routed through the boom. When this
continuity is broken, the unloader cartridges de-energize and
divert the function oil to tank. An indicator light is provided on
the control console to alert the operator when a two-block
condition is detected.
On machines equipped with an optional Rated Capacity
Limiter (RCL) System, the A2B system is integral with the
RCL wiring and display. An audible, visual warning of the two
block condition is provided in the display console. See RCL
Operators Handbook for additional information.
Normal functioning is restored by hoisting down (or retracting
boom) until the weight is once again suspended freely.
Occasionally if the hoist up and boom extend functions are
operated at maximum speed in the dump mode, the back
pressure induced in the circuit will cause the hoist up or
boom extend functions to creep slightly (with no load on the
hook). Such a condition is not cause for alarm, as the back
pressure is not of sufficient magnitude to damage the cable
or end connections.
OUTRIGGER MONITORING SYSTEM (OMS)
(OPTIONAL—STANDARD IN NORTH
AMERICA)
The Outrigger Monitoring System (OMS) aids the operator in
ensuring that the crane is properly setup on outriggers and
stabilizers. The OMS utilizes one sensor in each outrigger
and one proximity switch in each horizontally extending
stabilizer to identify when the outriggers and stabilizer beams
CAUTION
If the BOS feature Is run continuously or with an overload,
damage to the crane or truck could occur.
BOS
Handle
Note:
Maximum Capacity with “BOS”
•
One Part Line - 3000 lbs. (1361 kg)
•
Two Part Line - 6000 lbs. (2722 kg)
•
Three Part Line - 9000 lbs. (4082 kg)
•
Maximum line speed on third layer - 271 FPM
(73mpm), fourth layer - 294 FPM (81 mpm)
Hoist Lever
FIGURE 3-3
Fo
r
Reference
Only
Содержание National Crane 600E-2
Страница 1: ...Operator Manual National Crane 600E 2 F o r R e f e r e n c e O n l y ...
Страница 2: ...F o r R e f e r e n c e O n l y ...
Страница 10: ...TOC 6 TABLE OF CONTENTS OPERATOR MANUAL 600E2 THIS PAGE BLANK F o r R e f e r e n c e O n l y ...
Страница 121: ...F o r R e f e r e n c e O n l y ...
Страница 122: ...F o r R e f e r e n c e O n l y ...