11.1 Checklist: moving, setting up and installing the appliance
Target reader
The following checklists are aimed at the qualified person employed by the authorized service compa‐
ny who has overall responsibility for preparing the appliance for first-time use (start-up engineer).
Action
As start-up engineer, enter the basic information and check the installation against the following
checklists.
Check the box of those conditions that have been satisfied.
Basic information
Enter the basic information below:
Location of installed appliance (ad‐
dress)
Appliance number (as given on type
plate)
Part number (as given on type plate)
Checklist
Check whether the following installation steps have been performed in accordance with requirements,
and check the box of those conditions that have been satisfied.
Moving the appliance
Requirements
met
Moving the appliance to the installation location on page 46
Setting up the appliance
Requirements
met
Requirements for the installation location on page 50
Unpacking on page 55
Taking the appliance off the pallet on page 59
Setting up a table-top unit on a work surface on page 61
Setting up a table-top unit on a stand on page 63
Setting up the appliance on a wheeled stand on page 65
Setting up a floor-standing unit on the floor on page 68
Installation
Requirements
met
Electrical installation on page 70
Gas installation on page 77
Water connection on page 86
Installing the fully automatic oven cleaning system on page 95 (optional)
11 Checklists and completion of installation
Installation manual
180
Содержание convotherm 4
Страница 2: ......
Страница 9: ...Sequential number 4 digits 5 Gas data BTU hr gas type 1 General information Installation manual 9 ...
Страница 184: ......
Страница 185: ......