Manitowoc 12000-1 Скачать руководство пользователя страница 9

Reference 

Only

5

12000-1 / 12000E-1

TABLE OF CONTENTS

 ]

10.1.12  LOAD DETECTOR (CRANE)

 .........................................................................................10-53

10.1.13  ANGLE SENSOR

 ...............................................................................................................10-55

10.1.14  HOW TO CHECK THE FAILURE CONTENTS

 .........................................................10-56

10.1.15  WARNING DISPLAY CONDITION

 ................................................................................10-66

10.1.16  ENGINE ECU

 ......................................................................................................................10-77

10.1.17  DCU

 ........................................................................................................................................10-80

10.2 

LOAD SAFETY DEVICE

 .......................................................................................................10-84

10.2.1  CONFIGURATION OF SCREENS

 ................................................................................10-85

10.2.2  SYSTEM DIAGRAM

 ..........................................................................................................10-86

10.2.3  MONITOR DISPLAY

 ..........................................................................................................10-87

10.2.4  DETAIL OF ML CONTROLLER

 .....................................................................................10-94

10.2.5  SHIFTING TO MAINTENANCE SCREEN

 ..................................................................10-107

10.2.6  INPUT / OUTPUT SIGNAL

 ..............................................................................................10-109

10.2.7  ML FUNCTION SETTING

 ................................................................................................10-118

10.2.8  DATA COPY, FORMAT

 .....................................................................................................10-120

10.2.9  LANGUAGE, UNIT SETTING

 .........................................................................................10-124

10.2.10  ML ADJUSTMENT (NORMAL)

 .......................................................................................10-125

10.2.11  ML ADJUSTMENT (TEMPORARY)

 ..............................................................................10-148

10.2.12  OPERATION PROGRESS

 ..............................................................................................10-149

10.2.13  VERSION INFORMATION

 ..............................................................................................10-152

10.2.14  FAILURE HISTORY

 ...........................................................................................................10-153

10.2.15  ADJUSTMENT DATA

 ........................................................................................................10-156

10.2.16  TEST FACILITY

 ..................................................................................................................10-162

10.2.17  DOWNLOAD ML PROGRAM

 .........................................................................................10-164

10.2.18  DOWNLOAD OF MONITOR PROGRAM

 ...................................................................10-166

10.3 

MAIN CONTROLLER

 .............................................................................................................10-171

10.3.1  ARRANGEMENT OF MAIN CONTROLLER

 ..............................................................10-171

10.3.2  COMPOSITION OF SYSTEM

 ........................................................................................10-172

10.3.3  FUNCTION OF MAIN CONTROLLER

 .........................................................................10-173

10.3.4  MAIN CONTROLLER 1, 2 (HARDWARE)

 ..................................................................10-209

10.3.5  SPECIFICATIONS OF MAIN CONTROLLER INPUT/OUTPUT

 ..........................10-210

10.3.6  ARRANGEMENT OF MAIN CONTROLLER CONNECTOR PIN

 ........................10-224

10.3.7  ADJUSTMENT OF MAIN CONTROLLER

 ..................................................................10-240

10.3.8  CONTROLLER MALFUNCTION EMERGENCY MEASURES

 .............................10-245

11. CONNECTOR LAYOUT

12. AIR CONDITIONER

12.1 

NAME OF THE AIR CONDITIONER PARTS

 ..................................................................12-1

12.2 

ELECTRIC WIRING DIAGRAM

 ..........................................................................................12-7

12.3 

PARTS ILLUSTRATION

 ........................................................................................................12-8

Published 07-15-16, Control # 254-01

Содержание 12000-1

Страница 1: ...nitowoc Crane Care Lattice Team has of providing you with correct parts and service information Always furnish serial number of crane when ordering parts or discussing service problems with your Manitowoc distributor or the Manitowoc Crane Care Lattice Team To prevent death or serious injury Avoid unsafe operation and maintenance Crane and attachments must be operated and maintained by trained and...

Страница 2: ...R e f e r e n c e O n l y THE ORIGINAL LANGUAGE OF THIS PUBLICATION IS ENGLISH ...

Страница 3: ...NCE STANDARDS TEST PROCEDURES 3 GENERAL WORK STANDARD 4 POWER TRAIN 5 HYDRAULIC SYSTEM 6 HOIST SYSTEM 7 BOOM HOIST SYSTEM 8 SWING SYSTEM 9 TRAVEL SYSTEM 10 ELECTRIC SYSTEM 11 CONNECTOR LAYOUT 12 AIR CONDITIONER 13 TRANSLIFTER SYSTEM 14 TROUBLESHOOTING Published 07 15 16 Control 254 01 ...

Страница 4: ...R e f e r e n c e O n l y Published 07 15 16 Control 254 01 ...

Страница 5: ...ICATION PERFORMANCE 1 28 1 6 3 CRANE WORKING RANGES 1 30 1 7 12000E 1 DIMENSION WEIGHT OF EACH COMPONENT 1 33 1 7 1 BASE MACHINE 1 33 1 7 2 COUNTERWEIGHT 1 35 1 7 3 ATTACHMENT 1 37 1 8 12000E 1 CLAMSHELL RATED LOADS OPTION 1 41 1 9 12000E 1 SWING AND TRAVEL STABILITY 1 44 1 10 12000E 1 TRAVEL ALLOWABLE SLOPE ANGLE 1 47 1 10 1 CRANE ATTACHMENT INSTALLED BOOM INSERT CONFIGURATION 1 47 1 11 ENGINE MA...

Страница 6: ...ALLATION OF THE ENGINE 4 10 4 3 PUMP DRIVE ASSEMBLY 4 14 4 3 1 CONSTRUCTION OF THE POWER DIVIDER 4 15 4 3 2 CONSTRUCTION OF THE COUPLING 4 20 4 3 3 REMOVAL OF EACH PUMP 4 21 4 3 4 REMOVAL OF THE POWER DIVIDER 4 22 4 3 5 REMOVAL OF THE COUPLING 4 23 4 3 6 DISASSEMBLING THE POWER DIVIDER 4 24 4 3 7 CHECK AND REPAIR OF THE POWER DIVIDER 4 26 4 3 8 ASSEMBLING THE POWER DIVIDER 4 27 4 3 9 INSTALLATION ...

Страница 7: ... 3 HOLDING A HOISTED LOAD 6 10 6 2 4 LOWERING A LOAD POWER LOWERING 6 12 6 2 5 FREE FALL OPERATION 6 14 6 2 6 G WINCH MODE LIFTING 6 22 6 2 7 G WINCH MODE LOWERING 6 24 6 3 WINCH 6 26 6 3 1 WINCH INSTALLATION 6 26 6 3 2 WINCH ASSEMBLY 6 27 6 3 3 REDUCTION UNIT ASSEMBLY 6 28 6 3 4 ADJUSTMENT OF DRUM LOCK 6 30 6 4 BRAKE PEDAL 6 31 6 4 1 ASSEMBLY DRAWING 6 31 6 4 2 ADJUSTING THE BRAKE PEDAL 6 34 6 4 ...

Страница 8: ...TS LOCATION 9 1 9 2 CONSTRUCTION AND FUNCTION 9 2 9 2 1 HYDRAULIC SCHEMATIC 9 2 9 2 2 TRAVELING RIGHT SIDE FORWARD 9 3 9 2 3 STOPPING 9 4 9 3 CRAWLER 9 5 9 3 1 DRIVE ASSEMBLY 9 5 9 3 2 REDUCTION UNIT 9 6 9 3 3 MOTOR 9 7 9 3 4 ADJUSTMENT OF SHOE 9 10 10 ELECTRIC SYSTEM 10 1 ELECTRICAL 10 3 10 1 1 ELECTRICAL WIRING SCHEMATIC 10 3 10 1 2 WIRE COLOR LIST 10 25 10 1 3 LOCATION AND USE OF FUSE 10 26 10 ...

Страница 9: ...ENT TEMPORARY 10 148 10 2 12 OPERATION PROGRESS 10 149 10 2 13 VERSION INFORMATION 10 152 10 2 14 FAILURE HISTORY 10 153 10 2 15 ADJUSTMENT DATA 10 156 10 2 16 TEST FACILITY 10 162 10 2 17 DOWNLOAD ML PROGRAM 10 164 10 2 18 DOWNLOAD OF MONITOR PROGRAM 10 166 10 3 MAIN CONTROLLER 10 171 10 3 1 ARRANGEMENT OF MAIN CONTROLLER 10 171 10 3 2 COMPOSITION OF SYSTEM 10 172 10 3 3 FUNCTION OF MAIN CONTROLL...

Страница 10: ......

Отзывы: