SECTION 2.3 – INSTALLATION SAFETY
Before any installation of BFVs begins, make sure that all related safety procedures and protocols are
followed.
For Buried Service BFVs, any work to be done in an open trench should be in accordance with
OSHA regulation CFR 1926, Subpart P “Excavations”.
For Vault Service BFVs, all entry should be in accordance with OSHA regulation CFR 1910.146
“Confined Spaces”.
For In-Plant BFVs, installation and design should be in accordance with ASME Pressure Vessel
Code and other applicable standards.
Individual states may have more stringent regulations. Contact the appropriate state agency before any
work is begun for additional information and any potential permitting requirements.
SECTION 2.4 – INSIDE DIAMETER OF MATING PIPE
The Inside Diameter (ID) of the mating of the piping system should be considered BEFORE installing the
valve. When BFVs open, the vane will extend into the mating piping system. With many thick wall
plastic piping systems, there is the potential for the BFV vane to interfer with the pipe wall during
opening. This situation applies to all AWWA BFVs, barring a substantially undersized vane. For the
Mating Pipe wall clearance for M&H BFVs, see Drawing BFV-VANE: