
24
SP2000, SP2300, SP2400 | 1.00.03
www.mc-techgroup.com
Put connection piece or tube end into the fitting in the sample gas outlet of the probe and tighten the union
nut by hand.
The temperature-resistant, stainless steel connectors supplied by
M&C
have a double ferrule system to ensure
reliable sealing. After tightening the nuts of these connectors by hand, they should then be tightened exactly
1¼ of a turn using a flat spanner and are then properly mounted.
Close mounting bracket
. In case of larger sample line diameters, it may be necessary for the central mounting
of the sample line to loosen the two screws and move the small mounting angle
of the mounting bracket
and then re-tighten them.
Now place the heat conducting jaws
around the sample gas connection in the retaining slot and fix with the
knurled nut
.
Caution
Never operate probe without heat conducting jaws because of the resulting cold bridge
blocking of connector and line is to be expected!
14.5
CONNECTION OF OPTION TEST GAS FEEDING OR BLOW BACK LINE
When using the options
/R
or 3-way ball valve option
/3VA
or
/3VA320
, the corresponding tubes for test
gas feeding or blow back are connected by means of a tube connection on the respective 6 mm tube socket
below the probe housing.
Figure 8
Connection test gas feeding or blow back line
Содержание SP Series
Страница 22: ...22 SP2000 SP2300 SP2400 1 00 03 www mc techgroup com Figure 6 Mounting of sample tube or prefilter ...
Страница 38: ...38 SP2000 SP2300 SP2400 1 00 03 www mc techgroup com Figure 18 Wiring plan of control unit 234B ...
Страница 40: ...40 SP2000 SP2300 SP2400 1 00 03 www mc techgroup com Figure 19 Filter elements and gaskets Washer 93S0034 ...
Страница 48: ...48 SP2000 SP2300 SP2400 1 00 03 www mc techgroup com Figure 24 SP2000 H basic version ...
Страница 49: ...www mc techgroup com SP2000 SP2300 SP2400 1 00 03 49 Figure 25 SP2000 H with options ...
Страница 50: ...50 SP2000 SP2300 SP2400 1 00 03 www mc techgroup com Figure 26 SP2300 H ...
Страница 51: ...www mc techgroup com SP2000 SP2300 SP2400 1 00 03 51 Figure 27 SP2300 H filter elements ...
Страница 52: ...52 SP2000 SP2300 SP2400 1 00 03 www mc techgroup com Figure 28 High temperature tube aluminium oxide AO ...
Страница 53: ...www mc techgroup com SP2000 SP2300 SP2400 1 00 03 53 Figure 29 Heated sample tubes SP30 H ...
Страница 54: ...54 SP2000 SP2300 SP2400 1 00 03 www mc techgroup com ...
Страница 55: ...www mc techgroup com SP2000 SP2300 SP2400 1 00 03 55 Figure 30 Test gas feeding and blow back possibilities ...
Страница 56: ...56 SP2000 SP2300 SP2400 1 00 03 www mc techgroup com Figure 31 SP2000 H 3VA MS NC B ...
Страница 57: ...www mc techgroup com SP2000 SP2300 SP2400 1 00 03 57 Figure 32 SP2000 H 3VA MS NC C ...
Страница 58: ...58 SP2000 SP2300 SP2400 1 00 03 www mc techgroup com Figure 33 SP2000 H 3VA MS NO B ...
Страница 59: ...www mc techgroup com SP2000 SP2300 SP2400 1 00 03 59 Figure 34 SP2000 H 3VA MS NO C ...