15. DEBUGGING
Each Mammoth fan is tested prior to leaving the factory, if there seems to be a problem
double check all electrical connections, and contact the Mammoth support team.
16. COMMISSIONING
Use a spirit level and ensure blades are level before switching on. Run the fan for 15mins
and observe, is it spinning in the correct direction (anti-clockwise for summer), listen for any
abnormal noise, ensure there is no movement in the support cables. Check the current is
within the rated range.
17. HANDOVER
Ensure the customer is instructed on how to operate and isolate the fan