Mammoth Fans INDUSTRIAL SERIES |
11
FAN INSTALLATION
9. STEEL WIRING
Important – support wires should be evenly spaced in 4 opposing directions to evenly
distribute any stress and movement. Wire clamps should be secure and glued with screw
glue (Loctite or similar)
10. POWER CABLE
Wiring should be to local regulations
11. FAN BLADES
Fan blades should be mounted one after the other in opposites to each other, two people
will be required to effectively mount and tighten the fan blades and safety support screws.
This procedure must be done while the fan motor is mounted on the ceiling. Trying to
compete this on the floor then mounting the fan will cause damage to the blades.
12. FAN BLADE TIP
INSTALLATION
Fan Blade Tip
13. CONTROL
SYSTEM
The height from floor to the bottom of the control box should be around
1.2 meters and in a safe and practical position
14. WIRING
Distinguish the input and output, also make sure the ground wire is in place,
wire to local wiring standards.
Содержание 211400
Страница 20: ...I N D U S T R I A L S E R I E S ...