Organise poles and connectors into their colours and groups.
Unzip and lay out tent.
Locate floor section and lay flat with edge sections vertical.
Assemble floor poles and 3-way corners and 4-way Joins as shown.
Fit support pole.
Lift tent over roof as shown.
Step 1
Step 2
Step 3
Step 4
3-Way Corner
4-Way Join
3-Way Corner
4-Way Join
ring
Straight Pole
Connectors
Centre
Securing Ring
Insert ceiling poles into 3-way corners and 4-Way joins.
Fit centre securing ring over pole before fitting to 4-way join.
Fit centre ceiling poles into straight pole connectors.
Support Pole
Rubber Ends
Insert lower wall poles (chamfered end) into 3-way corners and 4-way Join.
Insert upper wall poles (shrunk end) into lower poles.
Fit 3-way corners and 4-way joins on top.