background image

Organise poles and connectors into their colours and groups.
Unzip and lay out tent.
Locate floor section and lay flat with edge sections vertical.
Assemble floor poles and 3-way corners and 4-way Joins as shown.

Fit support pole.

Lift tent over roof as shown.

Step 1

Step 2

Step 3

Step 4

3-Way Corner

4-Way Join

3-Way Corner

4-Way Join

ring

 Straight Pole
 Connectors

      Centre 
Securing Ring

Insert ceiling poles into 3-way corners and 4-Way joins.
Fit centre securing ring over pole before fitting to 4-way join.
Fit centre ceiling poles into straight pole connectors.

Support Pole
Rubber Ends

Insert lower wall poles (chamfered end) into 3-way corners and 4-way Join.
Insert upper wall poles (shrunk end) into lower poles.
Fit 3-way corners and 4-way joins on top.

Отзывы: