TABLE 3

ROOF PITCH 

MINIMUM HEIGHT

Feet 

Meters

Flat to 7/12 

0.3

Over 7/12 to 8/12 

1.5 

0.46

Over 8/12 to 9/12 

0.61

Over 9/12 to 10/12 

2.5 

0.76

Over 10/12 to 11/12 

3.25 

0.99

Over 11/12 to 12/12 

1.22

Over 12/12 to 14/12 

1.52

Over 14/12 to 16/12 

1.83

Over 16/12 to 18/12 

2.13

Over 18/12 to 20/12 

7.5 

2.29

Over 10/12 to 21/12 

2.44

Page - 9

CATHEDRAL CEILING 

INSTALLATION

Step 1.

 Follow installation Steps 1 and 2 under 

Vertical Terminations.

Step 2.

 

Using the plumb bob, mark Figure 18 

the center line of the venting system on the ceil

-

ing and drill a small hole through the ceiling and 

roof at this point. From the roof, locate the drill 

hole and mark the outline of the Cathedral Ceil

-

ing Support Box.

 

Step 3.

 Remove shingles or other roof cover

-

ing as necessary to cut the rectangular hole 

for the Support Box (refer to Table 1 for dimen

-

sions). Cut the hole 1/8-inch larger than the 

Support Box outline.

Step 4.

 Lower the Support Box through the 

hole in the roof until Support Box protrudes at 

least 1-inch below the low side of the ceiling 

(Fig. 20). Align the Support Box both vertically 

and horizontally with a level. Temporarily tack 

the Support Box in place through the inside 

walls and into the roof sheathing.

Step 5.

 Using tin snips, cut the Support Box 

from the top corners down to the roof line, and 

fold the resulting flaps over the roof sheathing. 

The flaps may be trimmed as needed (Fig. 21). 

Before nailing it to the roof, run a bead of non-

hardening sealant around the Support Box, to 

make a seal between the Support Box and the 

roof. Clean out any combustible material from 

inside the Support Box. 

Step 6.

 Follow Steps 4 and 5 (page 14) of the 

Vertical Installation Instructions.

Step 7. 

Follow Steps 7 through 10 (page 15 & 

16) of the Vertical Installation Instructions.

Step 8.

 Install the black Trim Collar around the 

outside of the Cathedral Ceiling Support Box. 

The two pieces of the Trim Collar slide over one 

another to allow for easy adjustment around the 

Support Box. Using the six (6) screws provided, 

secure the four corners and the overlapping 

sections of the Trim Collar to the underside of 

ceiling. You may want to pre-drill the holes for 

the overlapped sections for ease of installation 

(Fig. 22). 

Figure 19

THE REQUIRED 

CLEARANCE FROM 

THE OUTSIDE OF 

THE DIRECTVENT 

PRO 4" X 6 5/8" IS A 

MINIMUM OF 1 INCH 

TO COMBUSTIBLE 

MATERIALS

34ZDV 6/1/18

Содержание 34 Zircon Direct Vent

Страница 1: ...staller serviceagencyorthe gas supplier WARNING Improper installation adjustment alteration service or maintenance can cause injury or property damage Refer to this manual 34 Zircon Direct Vent Do not...

Страница 2: ...s of the appliance must kept clean Page 2 Unpack all parts from cartons carefully inspecting all parts If any parts are damaged or missing contact shipper or dealer immediately Do not install this app...

Страница 3: ...ion Young children should be carefully supervised when they are in the same room as the appliance Toddlers young children and others may be susceptible to accidental contact burns A physical barrier i...

Страница 4: ...des for its required placement and valve type In general it must be placed within 6 of the appliance This valve is not provided 8 Middle Pipe Section 8 Slip Connector Framing Sheet Rock 4 x 6 DirectVe...

Страница 5: ...prior to cutting Step 1 The Dura Vent DirectVent Pro 4 x 6 5 8 coaxial pipe must have a 1 clearance to combustibles when passing through ceilings walls roofs enclosures attic rafters or other nearby...

Страница 6: ...Ensure that all Pipe and Elbow connections are in their fully twist locked position Step 6 Cut a hole in the roof centered on the DirectVent Pro pipe from the Support Box The opening should be of suf...

Страница 7: ...e top of the Roof Flash ing Fig 18 Use non hardening sealant between the Storm Collar and the Pipe Section Step 10 Holding the bottom of the Termination Cap only twist lock the cap onto the last Pipe...

Страница 8: ...ote 3 continued For a chase enclosure it may be con structed out of sheetrock or similar building materials and framed around the support box or the pipe maintaining the clearance to combustibles of 1...

Страница 9: ...x both vertically and horizontally with a level Temporarily tack the Support Box in place through the inside walls and into the roof sheathing Step 5 Using tin snips cut the Support Box from the top c...

Страница 10: ...caps pipe and fit tings It may be caused by having excessive lateral runs too many elbows and exterior portions of the system being exposed to cold weather 4 Inspect joints to verify that no Pipe Sec...

Страница 11: ...nector at the top of the unit connec tor Step 5 The unit connector pipe covers the 3 flex The Standard unit includes enough con nector pipe for a ceiling height of 96 inches or 8 feet from the floor t...

Страница 12: ...the Horizontal Vent Termination on an exterior wall must meet all local and national building codes and must not be easily blocked or obstructed Termination clearances are as follows a Clearance above...

Страница 13: ...if needed They can be set at 1 2 from the face of the support box 1 2 sheetrock can then be placed over the nailing strips for a flush finish to the box Secure the support box by screwing the box thr...

Страница 14: ...quently dripping at joints Continuous condensate can cause corrosion of caps pipe and fit tings It may be caused by having excessive lateral runs too many elbows and exterior portions of the system be...

Страница 15: ...ireplace Screen Barrier 6 A deeper support box available for pitched or open beam ceilings A copy of these instructions are available online at www malmfireplaces com It is important to read the Regen...

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ......

Страница 29: ......

Страница 30: ......

Страница 31: ......

Страница 32: ......

Страница 33: ......

Страница 34: ......

Страница 35: ......

Страница 36: ......

Страница 37: ......

Страница 38: ......

Страница 39: ......

Страница 40: ......

Страница 41: ......

Страница 42: ......

Страница 43: ......

Страница 44: ......

Страница 45: ......

Страница 46: ......

Страница 47: ......

Страница 48: ......

Страница 49: ......

Страница 50: ......

Страница 51: ......

Страница 52: ......

Страница 53: ......

Страница 54: ......

Страница 55: ......

Страница 56: ......

Страница 57: ......

Страница 58: ......

Отзывы: