Malm Fireplaces 34 Zircon Direct Vent Скачать руководство пользователя страница 12

Page - 12

34” Zircon Direct Vent

Through the Wall Vent Installation

The 34 Zircon Direct Vent can be installed with a through the wall kit available from Malm. The through 

the wall vent kit consists of the following:

1 - Inner and Outer support box.

1 - Dura Vent 46DVA-GK flex to 4” x 6” to Direct Vent Pro.

1 - Dura Vent 46DVA-HSCH High Wind Sconce Termination.
The clearance to combustibles for the 

DirectVent Pro coaxial vent is 2" on the 

top of the pipe to a combustible and 1" on 

the sides and bottom.
A minimum clearance of 12" must be 

maintained from the top of the cover pipe 

or elbow to the ceiling.
The horizontal run of venting must be 

level, or have a 1/4-inch rise for every 

1-foot of run towards the termination. 

Never allow the vent to run downward. A 

downward slope can trap heat and be

-

come a possible fire hazard.
The first step is to locate the center of

the horizontal pipe location. The mini

-

mum height is 68” from the floor to 

the center of the support box. This is a 

minimum height and may be exceeded. 

The vent is required to be a minimum of 

18” below any eves or roof overhang. 
The location of the Horizontal Vent Termination on an exterior wall must meet all local and national 

building codes, and must not be easily blocked or obstructed. Termination clearances are as follows:

(a) Clearance above the ground, veranda, porch, deck, or balcony: 12 inches minimum.

(b) Clearance to a window (operable or fixed closed) or door: 12 inches minimum.

(c) Vertical clearance to a ventilated soffit located above the Termination Cap (if soffit extends a horizon

-

tal distance of 2 feet out over the center line of the termination): 18 inches minimum.

(d) Clearance to an unventilated soffit: 12 inches minimum.

(e) Clearance to an outside corner: as tested by appliance manufacturer.

(f) Clearance to an inside corner: as tested by appliance manufacturer.

(g) Not to be installed above a meter/ regulator assembly within 3 feet horizontally from the center line  

     of the regulator.

(h) Clearance to a service regulator vent outlet: 6 feet minimum.

(i) Clearance to non-mechanical air supply inlet to a building or the combustion air inlet to any other 

    appliance: 12 inches minimum.

(j) Clearance to a mechanical air supply inlet: 6 feet minimum.

(k) Clearance above a paved sidewalk or paved driveway located on public property: refer to local code.

(l) Clearance under a veranda, porch, deck or balcony: 12 inches minimum.

EXHAUST

CONNECTOR

34ZDV 6/1/18

Содержание 34 Zircon Direct Vent

Страница 1: ...staller serviceagencyorthe gas supplier WARNING Improper installation adjustment alteration service or maintenance can cause injury or property damage Refer to this manual 34 Zircon Direct Vent Do not...

Страница 2: ...s of the appliance must kept clean Page 2 Unpack all parts from cartons carefully inspecting all parts If any parts are damaged or missing contact shipper or dealer immediately Do not install this app...

Страница 3: ...ion Young children should be carefully supervised when they are in the same room as the appliance Toddlers young children and others may be susceptible to accidental contact burns A physical barrier i...

Страница 4: ...des for its required placement and valve type In general it must be placed within 6 of the appliance This valve is not provided 8 Middle Pipe Section 8 Slip Connector Framing Sheet Rock 4 x 6 DirectVe...

Страница 5: ...prior to cutting Step 1 The Dura Vent DirectVent Pro 4 x 6 5 8 coaxial pipe must have a 1 clearance to combustibles when passing through ceilings walls roofs enclosures attic rafters or other nearby...

Страница 6: ...Ensure that all Pipe and Elbow connections are in their fully twist locked position Step 6 Cut a hole in the roof centered on the DirectVent Pro pipe from the Support Box The opening should be of suf...

Страница 7: ...e top of the Roof Flash ing Fig 18 Use non hardening sealant between the Storm Collar and the Pipe Section Step 10 Holding the bottom of the Termination Cap only twist lock the cap onto the last Pipe...

Страница 8: ...ote 3 continued For a chase enclosure it may be con structed out of sheetrock or similar building materials and framed around the support box or the pipe maintaining the clearance to combustibles of 1...

Страница 9: ...x both vertically and horizontally with a level Temporarily tack the Support Box in place through the inside walls and into the roof sheathing Step 5 Using tin snips cut the Support Box from the top c...

Страница 10: ...caps pipe and fit tings It may be caused by having excessive lateral runs too many elbows and exterior portions of the system being exposed to cold weather 4 Inspect joints to verify that no Pipe Sec...

Страница 11: ...nector at the top of the unit connec tor Step 5 The unit connector pipe covers the 3 flex The Standard unit includes enough con nector pipe for a ceiling height of 96 inches or 8 feet from the floor t...

Страница 12: ...the Horizontal Vent Termination on an exterior wall must meet all local and national building codes and must not be easily blocked or obstructed Termination clearances are as follows a Clearance above...

Страница 13: ...if needed They can be set at 1 2 from the face of the support box 1 2 sheetrock can then be placed over the nailing strips for a flush finish to the box Secure the support box by screwing the box thr...

Страница 14: ...quently dripping at joints Continuous condensate can cause corrosion of caps pipe and fit tings It may be caused by having excessive lateral runs too many elbows and exterior portions of the system be...

Страница 15: ...ireplace Screen Barrier 6 A deeper support box available for pitched or open beam ceilings A copy of these instructions are available online at www malmfireplaces com It is important to read the Regen...

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ......

Страница 29: ......

Страница 30: ......

Страница 31: ......

Страница 32: ......

Страница 33: ......

Страница 34: ......

Страница 35: ......

Страница 36: ......

Страница 37: ......

Страница 38: ......

Страница 39: ......

Страница 40: ......

Страница 41: ......

Страница 42: ......

Страница 43: ......

Страница 44: ......

Страница 45: ......

Страница 46: ......

Страница 47: ......

Страница 48: ......

Страница 49: ......

Страница 50: ......

Страница 51: ......

Страница 52: ......

Страница 53: ......

Страница 54: ......

Страница 55: ......

Страница 56: ......

Страница 57: ......

Страница 58: ......

Отзывы: