background image

Rudder Kit Installation

Position the cable clamps.  Make sure the vertran lines are aligned with the 
gunnal and away from obstacles inside of the kayak.  Once the desired 
positions are located, drill the pilot holes and put the screws through.

Feed the vectran lines into the 
entry holes as indicated.

Reaching inside from the hatch 
opening, and guide the vectran 
lines to the exit holes.

Pull the vectran lines out from the 
exit holes as indicated.

16

13

15

14

OUTSIDE

3

www.malibukayaks.com          [email protected]          1-877-952-9257

Malibu Kayaks LLC. all rights reserved.     

Отзывы: