16
5.2 START-UP OPERATION
Start-up must be done by the Maktek Authorised Services to validate the
warranty conditions.
The below must be applied:
ATTENTION;
The condensation reservoir of the boiler must be filled with
water during the first start-up. To ensure this, add 1/4 lt of water from the
boiler flue outlet as shown in the figure below before first operating.
ATTENTION;
If there is not enough water in the condensation reservoir
of the boiler, device can run by emiting smoke for a while.
- Make sure that fuse switch, which enables the energy connection of
boiler, is open. If the boiler has waited for a long time after the installation
in OFF mode without start-up, authorised service must check the
circulation pump in case of any squeezing.
• Turn on all the valves on boiler and installation pipes.
• Closed circuit water pressure must be at 1,5 bar (page 15).
• Choose the position of use with the help of P1 and P2 buttons on control
panel (page 7 and 18).
• You can start using the boiler by setting temperature at desired level.