
12
For such connections, the valid standards in that country must be complied
and the local public and health authorities' regulations, if any, must also be
observed. Condensation outlet pipe should be placed very carefully.
The pipe should not break when placed.
Pipe should not take the shape of a goose neck.
It should be clean.
Use the pipes in accordance with the applicable rules for the discharge of
condensate water.
Since the condensation water pH is close to 2 (acidity), necessary
precautions should be taken before any work is carried out. (Protective
gloves)
3.7 INSTALLATION CONNECTION DIAGRAM
Condensation
Water Outlet
Gas Connection 3/4”
DHW
Outlet
1/2”
Heating Water Outlet 3/4”
Filling Valve
Cold Water Inlet 1/2”
Return Water Inlet 3/4”
Condensation Tank
Cleaning Cover
Condensation Water
Outlet