Boiler should be mounted in balance, and mounted on 10cm high
place from ground when installed in boiler room.
•
Boiler should be connected to a well draught chimney and minimum
number of elbows should be used between chimney and boiler.
•
The boiler should be placed where it can get enough air for efficient
combustion. MAKTEK MKP series boilers are produced with closed
expansion tank and 3 bar safety valve on the device. It is
recommended that an additional safety valve could be installed on
device to meet the expansions in the installation too.
•
Inside of the installation must be cleaned before the first starting
boiler connecting to the installation. The best way is to give water
from one side of the pipes and drain it from the other side.
•
The circulation pump should be mounted on the return pipe of the
boiler water.
•
There should be adequate space left for service intervention, device
control and fuel loading while device is mounting.
•
Valve connection should be made on the boiler water return lines.
•
The chimney connections must be leakproof. The chimney
connection
pipes of the device must be used at the same diameter
without any
narrowing on section from the device outlet to the chimney
hole.
•
Earth
connection of the device should be done
properly
, electrical
connection of the circulation pump must be done correctly and
authorized service must be called at all electrical faults.
4.BOILER MOUNTING