12
Blade and wrenches can be stored on the left side of the
base and the rip fence and the miter gauge can be
stored at the right side of the base. The Blade Guard
Assembly and Side Guards can be stored independently
in the pocket provided on the back of the table base.
Installing and adjusting rip fence
WARNING:
•
Always be sure the tool is switched off and
unplugged before attempting to perform the
installation and adjustment of the rip fence.
1
2
009897
1) Install the rip fence so that the fence holder engages
with the nearmost guide rail. To secure the rip fence,
pivot fully the lever on the fence holder.
2) To check to be sure that the rip fence is parallel with
the blade, secure the rip fence 2 - 3 mm (5/64" - 1/8" )
from the blade. Raise the blade up to maximum
elevation. Mark one of the blade teeth with a crayon.
Measure the distance (A) and (B) between the rip fence
and blade. Take both measurements using the tooth
marked with the crayon. These two measurements
should be identical. If the rip fence is not parallel with the
blade, proceed as follows:
1
A
B
009901
1
008780
1.
Secure the rip fence by lowering the lever on it.
2.
Loosen the two hex bolts on the rip fence with the
hex wrench provided.
3.
Adjust the rip fence until it becomes parallel with
the blade.
4.
Tighten the two hex bolts on the rip fence.
008781
WARNING:
•
Be sure to adjust the rip fence so that it is parallel
with the blade, or a dangerous kickback condition
may occur.
Bring the rip fence up flush against the side of the blade.
Make sure that the guideline on the fence holder points
to the 0 graduation. If the guideline does not point to the
0 graduation, loosen the screw on the scale plate and
adjust the scale plate.
1
2
009899
Assembling slide table
1
2
2
3
009938
Secure slide rails with bolts provided with the tool.
Remove the clamping screw from the slide table that has
been fixed with it.
1. Bolts
2. Slide table
3. Clamping screw
1. Guideline
2. Screws
1. Hex bolts
1. Scale
1. Guide rail
2. Lever