OPERATION CONDITION
Before starting up
• As required, push-fit appropriate nozzle.
• Use extension cord of at least 1.5 mm
2
cross-sectional.
• The voltage rating stated on the tool should correspond to the mains voltage.
• Power cord and plug must be in perfect condition.
Starting up
Connect tool to mains supply.
Step-switch position
0 :
Tool is switched off
Step-switch position
I :
Tool heats to 350°C. Reduced air flow
Step-switch position
II :
Tool heats to 500°C. Maximum air flow
Step 0
Step I
Step II
GB
10