
July 2015
6. Mount Hammer case section (8-28) and Motor section
(29-33) to Housing L (36) while checking the following
points:
- align the notch of Yoke unit (29) with the projection of
Housing L (36)
- align the projection of Hammer case complete (13) with
the groove of Housing L (36)
Figure 24
7. Check the followings to make sure that Brush holder
complete (32) and Yoke unit (29) are properly mounted to
Housing L (36):
(A) The flat portion of Brush holder complete (32) must be
vertical against Housing L (36).
(B) After setting Yoke unit (29) to Housing L (36), fit the side
of Yoke unit (29) to the rib of Housing L (36).
(C) After setting Yoke unit (29) to Housing L (36), fit the side
of Brush holder complete (32) to the rib of Housing L
(36).
Figure 25
Notch of Yoke unit (29)
Projection of Hammer case
complete (13)
Flat portion of Brush
holder complete (32)
(A)
(B)
Groove
Projection
(C)
(29-33)
(8-28)
(36)
(29)
(36)
(32)
14 / 27
Содержание DTD152
Страница 4: ...July 2015 1 EXPLODED DIAGRAM Figure 1 4 27...