P 11/13
R
epair
[3] DISASSEMBLY/ASSEMBLY
[3] -5. Armature (cont.)
[3] -6. Switch
Fig. 40
Note: Be sure to place both of the two projections of Switch inside Switch lever as illustrated to left in
Fig. 40
DISASSEMBLING
ASSEMBLING SWITCH LEVER TO SWITCH
1) Remove Handles (R) and (L) and Gear housing cover section. (Figs. 6, 7 in page 4)
2) Disassemble Lever from Gear housing complete as illustrated in Fig. 41.
Fig. 41
[3] -7. Lever 17
Stop ring E-5
Lever 17
Remove Stop ring E-5 from the
shaft portion of Lever 17 using
slotted screwdriver or the like.
Pull off Lever 17 from Gear housing
complete. Compression spring 3 and
Cap 5 can now be removed from
Lever 17.
Compression spring 3
Cap 5
[Wrong]
[Correct]
Gear housing complete
The two projections of
Switch serves as the guide
for Switch lever.
Switch
Switch lever
projection
The projection will
be broken if placed
outside of Switch lever.
Turn Lever 17 to the position III
(= large orbital cutting action).
Note 2: Place the wire connecting portions upside when assembling Endbell complete to Motor housings (R) and (L)
as illustrated in Fig. 38. And route Lead wires of Endbell complete through the space between the cut portions
of Motor housings (R) and (L). (Fig. 39)
ASSEMBLING
Endbell complete
wire connecting portion
cut portion
Motor housing (L)
Motor housing (R)
Fig. 38
Fig. 39
cut portion
space between the cut portions
of Motor housing (R) and (L)
Lead wires