
P 13/16
[3] DISASSEMBLY/ASSEMBLY
[3] -4. Motor Section
R
epair
ASSEMBLING
1) Remove Casing assembly (Fig. 2 on page 3).
2) Disassemble Housing (R) from Housing (L). (Figs. 32, 33 on page 10)
3) Disassemble Motor section by taking the steps described in Fig. 41 to Fig. 43.
Fig. 41
Fig. 42
Do the reverse of the disassembling steps.
Note: Do not forget to mount O ring 24 on Ball bearing 6000LLB. (leftt in Fig. 43)
Retaining ring S-6
1R291
Spiral bevel gear 15
O ring 24
1R269
[3] -5. Switch
Put the projection on Switch between the prongs of F/R change lever,
then assemble the Switch to Housing (L). (Fig. 44)
Fig. 44
F/R Change Lever
Switch
projection
prong
DISASSEMBLING
Brush holder cap
Carbon brush
Fig. 43
3)
Remove O ring 24, Retaining ring S-6 and Spiral bevel gear 15 as illustrated below.
2) Remove Armature by tapping Endbell complete
with plastic hammer.
Endbell complete
Field
Armature
Power supply cord
Ball bearing 6000LLB
1) Remove Motor section (Armature, Endbell complete, Field) from
Housing (L) together with Power supply cord, then remove Carbon brush.
ASSEMBLING