Page
21
of
37
•
Once load is above platform and
safely beyond edge
–
lower the
lifting arm to lower the load onto
platform and take weight off hook
•
Disengage brake and remove hook
•
See section 3.2.6 for Hook
Operation detail
REVERSE SEQUENCE
–
LOADING AT HEIGHT
•
Once load is engaged on hook, lower handles whilst also lowering the
arm in order to maintain minimal load height above the platform.
•
Only release the brake once the load is in a
Hands Neutral Position
(as described in section 4- Load and Reach Data)
•
Then back the load up only as much as necessary to fully lower the load
and clear the platform using the procedure described in 3.3.1
Figure shows backing device away from unload
procedure whilst lowering the lifting arm
Содержание PHT-40
Страница 1: ...Rev 0917 ...
Страница 30: ...Page 30 of 37 7 SAFETY AND INSTRUCTION DECAL A B D C C A B C D E E F G I H J F G G H I J J J J K K ...
Страница 32: ...Page 32 of 37 CHARGER SPECIFICATIONS 3A ...
Страница 33: ...Page 33 of 37 9 DECLARATION OF CONFORMITY ...