1. There are three sets of countersunk pilot holes in the sled. Place the
ring carriage
in the
center and align with the pilot holes. Remove your ring carriage from your Maslow and
take it apart. Then, align the L-brackets with the ring bracket attachment on each set of
holes, with the tall sides toward the center. Screw the aligned
L-brackets
into the sled,
oriented with the ring carriage, using a
Phillips screwdriver
and the tiny
silver screws
.
Drew’s Note: You’ll use all the screws, bolts/wingnuts for these steps, so don’t lose them!
2. Attach the three L-brackets to the rectangular brackets on the ring carriage
using four small
black bolts and locking nuts
on each bracket. Use the
smallest
(2mm) hex wrench
on one side and the
flat wrench
on the other.
Drew’s Note: The ring carriage is
adjustable for the thickness of the
material you’re cutting! For now,
we’ll attach it at the top.
3. Hang a
roller bearing carriage
on each
side of attached ring carriage.
Z Axis
Bag C
Roller bearing carriages
7