![background image](http://html1.mh-extra.com/html/maker-made/m2/m2_setup-manual_3817165011.webp)
13. Insert the eight
bolts
into the holes from the outside of the base of the
left
and
right
sides of the Z axis assembly. From the inside of the z-axis assembly, hand tighten the
T-nuts
half-way onto the bolts.
Drew’s Note: The Z axis assembly attaches to the sled with T-nuts. They are marvels
of engineering that are specially designed to hold different materials together.
Some even turn sideways (perpendicular) when they are tightened! Ours fastens
the z axis assembly to the aluminum extrusion rails “feet” that are attached to the
sled.
14.
(A)
If attached, pop the caps off the ends of the sled rails.
(B)
Rotate the T-nuts, so
they are parallel with the inside of the sled rails.
(C)
Slide the Z-axis assembly onto
the rails, with the T-nuts sliding into the slots on the outside of the rails. Stop when the
router clamp is centered with the center sled hole.
Check out this T-nut
x-ray coolness!
(A)
(B)
(C)
Right
side
Left
side
Z Axis
Bag C
11