Major Science MD-01N-110 Скачать руководство пользователя страница 6

                                                                                              

 

 

To avoid electrical shock: 
1. In the event of solution accidentally spilled into the instrument, it must be 
dried out for a period of time, at least 2 hours, and restored to NORMAL 
CONDITION before each operation.   
2. NEVER connect or disconnect wire leads from the power jacks when the 
power is on. 
3. WAIT at least 5 seconds after stopping a run before handling output leads or 
connected apparatus. 
4. ALWAYS make sure that hands, work area, and instruments are clean and 
dry before making any connections or operating the equipments. 
5. ONLY connect the power cord to a properly grounded AC outlet. 
 

Avoiding Damage to the Instrument 

1. Do not attempt to operate the device if it is damaged. 
2. Protect this unit from physical damage, corrosive agents and extreme 
temperatures (direct sunlight, etc.). 
3. For proper ventilation and safety concerns, keep at least 10 cm of space 
behind the instrument, and at least 5 cm of space on each side. 
4. Use high level of precautions against the damages on the unit. 
5. Do not operate the unit out of environmental conditions addressed above. 
5. Prior to apply any cleaning or decontamination method other than 
manufacturer’s recommendation, users should check with the manufacturer’s 
instruction to see if the proposed method will damage the equipment. 
 

Equipment Operation 

Follow the guidelines below to ensure safe operation of the unit: 
1. Check the displayed temperature figure and external temp. probe to see if it 
is overheating, and check if it will function in the case of a single fault at least 
once per day. 
2. NEVER access dangerous chemicals or other materials to prevent possible 
hazard of explosion and damage. 
3. Do not apply lids or covers on the tube heated inside Genius Dry Bath 
Incubator to prevent possible hazards of explosion and damages. 
4. A temporary conductivity caused by condensation might occur even though 
this series is rated Pollution Degree 2 in accordance with IEC 664. 
 

Содержание MD-01N-110

Страница 1: ...Genius Dry Bath Incubator Instruction Manual Catalog No MD 01N 110 220 MD 02N 110 220 MD 01N T 110 220 MD 02N T 110 220 www majorsci com service majorsci com Version 02D Revision on 2015 08 12...

Страница 2: ...hasing MD 01N T 110 220 or MD 02N T 110 220 1 Single Block Genius Dry Bath Incubator or 1 Dual Block Genius Dry Bath Incubator 1 External Temperature Probe 1 Power Cord 1 Genius Dry Bath Incubator Ins...

Страница 3: ...s 10 Section 4 Installation Instructions 11 Section 5 Operation Instructions 12 Temperature Calibration 13 Section 6 Function Control Software Instructions 15 6 1 Installation Instruction 15 6 2 Opera...

Страница 4: ...fore operating this equipment 1 Read and follow carefully the manual instructions 2 Do not alter the equipment Failure to follow these directions could result in personal and or laboratory hazards as...

Страница 5: ...he electrical supply check to see if the supply voltage is within the range stated at the rating label and see to it that the device be seated firmly Place the unit in a safe and dry location it must...

Страница 6: ...ce behind the instrument and at least 5 cm of space on each side 4 Use high level of precautions against the damages on the unit 5 Do not operate the unit out of environmental conditions addressed abo...

Страница 7: ...st Consult the manual to avoid possible personal injury or instrument damage ATTENTION Hot surface Indicates disposal instruction DO NOT throw this unit into a municipal trash bin when this unit has r...

Страница 8: ...al results from one experiment to another Genius Dry Bath Incubators are also space compact instruments with competitive pricing offerings It is a user friendly unit that comes with great value More i...

Страница 9: ...or select timer mode 5 TIMER This LED light indicates running Timer Mode 6 Set Temp This LED light indicates temperature is on setting value 7 Heating This LED light indicates temperature is increasin...

Страница 10: ...t stability Temperature may be set in 0 1 C increments from 5 C above ambient to 150 C An optional temperature probe is available for placing directly in samples A timer equipped within the unit may b...

Страница 11: ...e proof for heating chamber Over Temperature protection SSR failure detection Operating Temperature Ambient to 40 C Heating Chamber Material Molded aluminum alloy chamber Chamber Dimension 104 5 x 79...

Страница 12: ...Dry Bath Incubator is actually a pre installed instrument As long as it is placed on a sturdy and level surface in a safe dry place and is inserted with one or two heating aluminum block s or simply w...

Страница 13: ...r 4 Turn the AC power ON 5 Run temperature calibration procedure when using the instrument for the first time see page 12 6 Press or Key to adjust to the desired temperature 7 If setting heating time...

Страница 14: ...1 Insert a 300mm calibrated laboratory thermometer into the thermometer holding port which is on the block or in the middle of chamber when water is filled 2 Switch the main power ON and press Key sim...

Страница 15: ...14 6 The calibrated procedure is finished Please wait for a few more minutes for the microprocessor to automatically adjust displayed temperature value to the same value with thermometer measured...

Страница 16: ...ete the installation 6 2 Operation Instruction 1 Start MD 01 software program The screen below will be displayed There are two main sections in the software View Chart and View History 2 View Chart Se...

Страница 17: ...rded REC period ON OFF To start or stop recording Enlarge the record table Move the record table 3 View History Section Serial Port No Communication port selections between computer and Genius Dry Bat...

Страница 18: ...table or not Temp PV ON OFF To show the real time temp value on the table or not CLEAR CHART OFF To clear up the curves in the table Open File ON to view historic record data OFF No historic record d...

Страница 19: ...olution Err1 If the actual temperature is over 5 C than the set temperature value during operation Err1 will be displayed along with alarm and the instrument will shut down automatically Turn off the...

Страница 20: ...th containing a mild soap solution The chamber and blocks are constructed of aluminum alloy and may be cleaned with any of the commercial aluminum cleaners on the market The heating surface contains a...

Страница 21: ...PCR plate for single block unit only MD MP01 D For Microplate Titerplate for dual block unit only MD MP02 D For 96 wells Deep Microplate or PCR Plate for dual block unit only MD B0 2 For 0 2 ml tube...

Страница 22: ...ty is limited to the receipt of reasonable proof by the customer that the defect is embraced within the terms of the warranty All claims made under this warranty must be presented to Major Science wit...

Страница 23: ...22 MEMO...

Страница 24: ...23 MEMO...

Отзывы: