background image

12

ODSHR Outdoor Woodburning Fireplace

20002264

Installing the Chimney System

Start by attaching the first chimney section to the collar 
on top of the fireplace.

  

Install the pipe as pictured in Figure 17.  When  you 
get a good lock, you will hear the pipe clearly snap 
together. Once sections are snap-locked in place, it is 
extremely difficult to get them apart.  

Make sure the 

pipe is firmly snapped and locked together as each 
pipe section is mounted.

When installing elbows, only outer pipe will snap- 
lock.  Middle pipes simply slide into position. Be sure 
to always attach straps on upper elbow to a structural 
framing member. (Fig. 18)
Continue installing the pipe as required until pipe is 
installed up through the ceiling. At this point, you must 
install a firestop spacer.

Installing the Firestop Spacer 

in the Ceiling Hole

A firestop spacer is used to keep pipe spaced properly 
and required for safety.
Nail the firestop spacer (at each corner) to the framing 
members of the ceiling hole. 

NOTE: 

 A firestop spacer 

is not required at the roof.
Hole sizes listed in Figure 12 for angled firestop spac-
ers provide minimum required air space to chimney 
pipe for ceiling thickness up to 8" (203 mm).  When 
combined thickness of ceiling material, ceiling joists 
and flooring material exceeds 8" (203 mm), adjust-
ments must be made in framing to assure that minimum 
air spaces to chimney are maintained.

Proper Firestop Spacer Installation

Figure 19 shows different installation procedures for  
both an area that 

is

 an attic and  an area that 

is not

 an 

attic.
If the area above the 
ceiling

 is not 

an attic, po-

sition the firestop spacer 
with the flange on the ceil-
ing side and the angled 
portion extending up into 
the hole.
If the area above the 
ceiling 

is

 an attic, position 

the firestop spacer with 
the flange on the top of 
the framed hole and the 
angled portion extending 
down into the hole.

FP270/271

CR Series

2/19/99   djt

Elbow Strap

Angled Strap

Fig. 18 

 Attach straps to a structural framing member.

FP270/271

Support Structure

Elbow Strap

(must be tight)

Ceiling 

Hole 

Framing

Angle Firestop

Chimney Support 

Strap

(must be tight)

Attic Installation

Ceiling Installation

Fig. 19 

 Installing firestop spacer.

FP285

IWF285

mbuf

5/25/96

Nails (4)

Firestop Spacer

Joist

Joist

Firestop 

Spacer

Nails (4)

Flange Down Into Hole

Flange Up Into Hole

UP

FP558SHR

snap lock

5/11/99   djt

FP558SHR

Fig. 17 

 Install pipe, listening for the snap-lock to fasten.

Inner Pipe 

Section

Hem

Lance

Pipe 

Rim

Pipe 

Rim

Содержание Vermont Castings ODSHR42

Страница 1: ...djt Homeowner s Installation and Operating Manual DO NOT DISCARD THIS MANUAL Retain for future use 20002264 10 06 Rev 17 Model ODSHR42 Underwriter s Laboratories Report No MH20546 ODSHR Series Outdoor...

Страница 2: ...re hazard and will void the warranty Safety Information 2 Speci cations and Framing Dimensions 3 Hearth Dimensions 4 Chase Installations 5 Freestanding Installation 5 Chimney Requirements 6 Planning...

Страница 3: ...e replace to cook or warm food Do not obstruct or modify air inlets outlets in any manner Do not install combustible materials on any of the replace surround Burn only solid wood fuel or gas logs Do n...

Страница 4: ...Air Gas Line Access Gas Line Access 62 1578 mm 340 mm 279 mm Fig 1 ODSHR42 Series speci cations and framing ODSHR42 Series Woodburning Fireplace A B C FP1531 hearth dimensions 9 04 djt Front Width Ba...

Страница 5: ...FP1001 fireplace setting 1 4 00 djt NOTE If the replace is a free standing unit it must be located a minimum of 10 3 m from the opening of the rebox to a com bustible structure A minimum height of 6...

Страница 6: ...ured from the hearth to the chimney exit ODSHR42 Maximum 90 27 4 m Minimum Without Elbows 14 6 4 4 m With 2 Elbows 15 6 4 7 m With 4 Elbows 21 0 6 4 m B Do not use more than 4 elbows per chimney Attac...

Страница 7: ...will be set and how the chimney system will be run Mounting the Fireplace A replace may only be mounted on the following sur faces 1 A at combustible surface 2 A raised wooden platform 3 A concrete bl...

Страница 8: ...e in a cold climate it is not required but highly recommended that you insulate replace enclosure to eliminate cold air penetration as much as possible Insulate base of replace with a noncombustible i...

Страница 9: ...CK THE END CONNECTION OF CHIMNEY SECTIONS AND ELBOWS NOTE ODSHR Series Fireplaces must use CFM Cor poration model 11CF 11 inch 2 wall chimney systems The installation procedure described in this manua...

Страница 10: ...bers Chimney Hole Size FP551b SHR 5 11 99 djt New Framing Members Existing Ceiling Joists Chimney Hole 17 445 mm 17 445 mm FP551b Fig 13 Typical frame for ceiling chimney hole Fig 12 Ceiling chimney h...

Страница 11: ...re place are noncombustible Four 4 nailing anges are supplied with the replace found on the replace hearth To level the box and secure it rmly in place remove the nailing anges from the hearth and ins...

Страница 12: ...o chimney pipe for ceiling thickness up to 8 203 mm When combined thickness of ceiling material ceiling joists and ooring material exceeds 8 203 mm adjust ments must be made in framing to assure that...

Страница 13: ...ize of roof hole There must be a 2 51 mm air space between out ermost portion of chimney sections and any adjacent combustible surfaces Combustible surfaces include burnable materials such as ceiling...

Страница 14: ...djt Air Space Clearances Combustible framing material MUST NOT pen etrate AIR SPACE shaded areas Standoff 2 Air Space to Sides Firestop Front View Side View Wall Shield Air Space to Back Air Space to...

Страница 15: ...ff Noncombustible Material Surround Face Fireplace Opening Noncombustible Facing Material Must be sealed with non combustible material Ledge Bracket Finished Wall 2 x 4 Stud Finished Wall Must be seal...

Страница 16: ...ensions FP838 Minimum Wall Clearances WITH Noncombustible Surround Facing WITHOUT Noncombustible Surround Facing Minimum Hearth Extension Dimensions for On Site Construction 12 20 12 66 Seal cracks be...

Страница 17: ...acent combustible side walls and hearth extension dimensions FP1171 sealing detail 12 20 01 djt Wall Covering 2 x 4 Header Do Not Notch at Ledge Brackets Fig 20 Hearth Extension Hearth Extension Insul...

Страница 18: ...place Surround and Wall Materials with Noncombustible Material Noncombustible Decorative Cover ing Majestic Safety Strips Must be Overlapped 1 2 Min Seal Crack Between Fire place and Hearth Exten sion...

Страница 19: ...djt 1 2 5 7 6 4 3 12 11 8 10 9a b 13 Ref Description Part Number 1 Damper Blade 3990185 2 Damper Handle 20001418 3 Screen Rail 20002262 4 Screen Rod 20002222 5 Screen two per replace 20002223 6 Scree...

Страница 20: ...ustion in the rebox This accessory must be installed before replace is installed Located on the oor in front of replace to protect the oor from heat hot embers ashes etc Used to patch cracks in hearth...

Страница 21: ...se with CF11 pipe RLTCF11L 11 ue 11CF1 1 long 11CF18 1 long 11CF3 3 long 11CF4 4 long 11CF30 2 11 30 ue S20BR BT BW S20UB Upper Baf e 20002673 FS2100 HT Contact the CFM Corporation with questions con...

Страница 22: ...22 ODSHR Outdoor Woodburning Fireplace 20002264...

Страница 23: ...y is extended only to a Fireplace installed in the continental United States the state of Alaska and Canada only if and so long as the Fireplace is installed according to the in stallation instruction...

Страница 24: ...2695 Meadowvale Blvd Mississauga Ontario Canada L5N 8A3 800 668 5323 www cfmcorp com CFM Corporation...

Отзывы: